Optional Rack-Mounting Equipment; Mounting; Rack Mounting - Enterasys Matrix VSER-RPU-SYS Hardware Installation Manual

Matrix v-series redundant power supply
Table of Contents

Advertisement

The device history (i.e., have you returned the device before, is this a recurring
problem, etc.)
Any previous Return Material Authorization (RMA) numbers

Optional Rack-Mounting Equipment

If you plan to rack-mount the RPS, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)

Mounting

RPS units can be mounted in a standard 19-inch equipment rack or on a desktop or
shelf. Mounting instructions for each type of site follow.

Rack Mounting

Before rack mounting the unit, pay particular attention to the following factors:
• Temperature: Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range.
• Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack assembly is not
overloaded.
• Grounding: Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.
2
Mounting
2-3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Matrix VSER-RPU-SYS and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF