Download Print this page

Craftsman 706.597400 Operator's Manual page 5

3 drawer service cart

Advertisement

Available languages

Available languages

r
STEP 3:
AA(12)
BB(12)
/
CC(12)
Place A on its back on packaging material as shown.
Packaging/:i..........................
i:,_:;:
material
7.
Packaging
material
• Attach assembly from steps 1 and 2, using (12) AA, (12) BB, and (12)
CC.
• The notches should be on the side with the label. Leave holes in
notches open for late assmbly.
Leave open for
later assembly
.Label
Notch
_lllll
f
STEP 4:
AA(2)
BB(4)
/
CC(4)
EE(2)
In a seperate
bag
• Attach handle (B) to bottom set of holes using (2) AA, (2) BB,
and (2) CC.
• Install (2) EE in top set of holes using (2) BB and (2) CC.
/
/
/
/
EE
In a seperate
bag
\
/AA
/
• Install (2) L, as shown.
• Close the lid. Adjust for optimum lock performance.
• Open the lid.
• Wrench tighten all fasteners.
.)

Advertisement

loading