Sidewall Direct Venting Vent/Air Termination - Sidewall; Determine Location - Lochinvar Crest 2.5 Installation & Operation Manual

Condensing boiler
Hide thumbs Also See for Crest 2.5:
Table of Contents

Advertisement

4
Sidewall direct venting
Vent/air termination – sidewall
Follow
WARNING
determining vent location to avoid
possibility of severe personal injury, death,
or substantial property damage.
A gas vent extending through an exterior
WARNING
wall shall not terminate adjacent to a wall
or below building extensions such as eaves,
parapets, balconies, or decks. Failure to
comply could result in severe personal
injury, death, or substantial property
damage.
WARNING Do not connect any other appliance to the
vent pipe or multiple boilers to a common
vent pipe except as noted in Section 2
on page 18.
result in severe personal injury, death, or
substantial property damage.
Sidewall venting commercial products will
CAUTION
result in large exhaust plumes in cold
climates. Consideration should be taken
when locating in proximity to windows,
doors, walkways, etc.
Installation must comply with local
NOTICE
requirements and with the National Fuel
Gas Code, NFPA 54 / ANSI Z223.1 for U.S.
installations or CSA B149.1 for Canadian
installations.

Determine location

Locate the vent/air terminations using the following
guidelines:
1. The total length of piping for vent or air must not exceed
the limits given in the General Venting Section on page
17 of this manual.
2.
You must consider the surroundings when terminating
the vent and air:
a.
Position the vent termination where vapors will
not damage nearby shrubs, plants or air
conditioning equipment or be objectionable.
b. The flue products will form a noticeable plume as
they condense in cold air. Avoid areas where the
plume could obstruct window views.
c.
Prevailing winds could cause freezing of condensate
and water/ice buildup where flue products impinge
on building surfaces or plants.
d. Avoid possibility of accidental contact of flue
products with people or pets.
e.
Do not locate the terminations where wind eddies
could affect performance or cause recirculation,
such as inside building corners, near adjacent
buildings or surfaces, window wells, stairwells,
alcoves, courtyards, or other recessed areas.
instructions
below
when
Failure to comply could
Installation & Operation Manual
Sidewall vent and air inlet terminations
WARNING
must terminate in the same pressure
zone.
f.
Do not terminate above any door or above or
below any window. Condensate can freeze, causing
ice formations.
g.
Locate or guard vent to prevent condensate
damage to exterior finishes.
Figure 4-1 Sidewall Termination of Air and Vent
PVC/CPVC or ABS is acceptable air inlet pipe material.
NOTICE
FROM BOILER VENT
PIPE CONNECTION
TO BOILER INTAKE
AIR CONNECTION
3.
Maintain clearances as shown in FIG.'s 4-1 thru 4-3,
pages 21 and 22. The vent termination should not be
located in traffic areas such as walkways, adjacent
buildings, operable windows, or doors. Also maintain
the following:
a.
Vent must terminate:
• At least 6 feet (1.8 m) from adjacent walls.
• Not less than 7 feet (2.1 m) above grade where located
adjacent to public walkways.
• No closer than 12 inches (305 mm) below roof
overhang.
• At least 3 feet (.9 m) above any forced air intake
within 10 feet (3 m).
• No closer than 4 feet (1.2 m) horizontally
from any door or window or any other gravity air
inlet.
b. Air inlet must terminate at least 12 inches (305 m)
above grade or snow line; at least 36 inches
(914 mm) below the vent termination.
c.
Do not terminate closer than 4 feet (1.2 m)
horizontally from any electric meter, gas meter,
regulator, relief valve, or other equipment. Never
terminate above or below any of these within 4 feet
(1.2 m) horizontally.
4. Locate terminations so they are not likely to be damaged
by foreign objects, such as stones or balls, or subject to
buildup of leaves or sediment.
36" MIN
48" MAX
12" MIN
GRADE OR
SNOW LINE
21