Check Charge; Final Checks; Care And Maintenance - Carrier 24APA7 Performance Installation Instructions Manual

Performance series 2-stage air conditioner with puron refrigerant 2 to 5 nominal tons
Hide thumbs Also See for 24APA7 Performance:
Table of Contents

Advertisement

*
UTILITY RELAY
UTILITY SIGNAL
OPEN RELAY
*
SUPPLIED BY UTILITY PROVIDER

Check Charge

The 24APA7 unit should be charged in high stage compressor
operation.
Factory charge amount and desired subcooling are
shown on unit rating plate. Charging method is shown on
information plate inside unit. To properly check or adjust charge,
conditions must be favorable for subcooling charging. Favorable
conditions exist when the outdoor temperature is between 70_F
and 100_F (21.11_C and 37.78_C), and the indoor temperature is
between 70_F and 80_F (21.11_C and 26.67_C). Follow the
procedure below:
Unit is factory charged for 15ft (4.57 m) of lineset. Adjust charge
by adding or removing 0.6 oz/ft of 3/8 liquid line above or below
15ft (4.57 m) respectively.
For standard refrigerant line lengths (80 ft/24.38 m or less), allow
system to operate in cooling mode at least 15 minutes. If conditions
are favorable, check system charge by subcooling method. If any
adjustment is necessary, adjust charge slowly and allow system to
operate for 15 minutes to stabilize before declaring a properly
charged system.
If the indoor temperature is above 80_F (26.67_C), and the
outdoor temperature is in the favorable range, adjust system charge
by weight based on line length and allow the indoor temperature to
drop to 80_F (26.67_C) before attempting to check system charge
by subcooling method as described above.
If the indoor temperature is below 70_F (21.11_C), or the outdoor
temperature is not in the favorable range, adjust charge for line set
length above or below 15ft (4.57 m) only. Charge level should then
be appropriate for the system to achieve rated capacity. The charge
level could then be checked at another time when the both indoor
and outdoor temperatures are in a more favorable range.
NOTE: If line length is beyond 80 ft (24.38 m) or greater than 20
ft (6.10 m) vertical separation,
special charging requirements.
MODEL
PLUG
Fig. 6 - - 2- -Stage Control Board
See Long Line Guideline for
LLS
Liquid Line Solenoid

Final Checks

IMPORTANT: Before leaving job, be sure to do the following:
1. Ensure that all wiring is routed away from tubing and sheet
metal edges to prevent rub- -through or wire pinching.
2. Ensure that all wiring and tubing is secure in unit before
adding panels and covers. Securely fasten all panels and
covers.
3. Tighten service valve stem caps to 1/12- -turn past finger
tight.
4. Leave Owner's Manual with owner. Explain system opera-
tion and periodic maintenance requirements outlined in
manual.
5. Fill out Dealer Installation Checklist and place in customer
file.

CARE AND MAINTENANCE

For continuing high performance and to minimize possible
equipment failure, periodic maintenance must be performed on this
equipment.
Frequency of maintenance may vary depending upon geographic
areas, such as coastal applications. See Owner's Manual for
information.
7
MODEL
PLUG
A06526

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents