Connecting The Cords - Brother BAS-300G-484/484SF Instruction Manual

Direct drive programmable electronic pattern sewer
Hide thumbs Also See for BAS-300G-484/484SF:
Table of Contents

Advertisement

3. INSTALLATION

3-9. Connecting the cords

<Main P.C. board>
NOTE:
• Check that the connector is facing the correct
way, and then insert it firmly until it locks into
place.
• Secure the cables with cable ties and cord
clamps, while being careful not to pull on the
connector.
*1:
Be sure to make the ground connection.
(Refer to "3-10. Connecting the ground wire".)
*2:
Only applicable to -484 SF specifications.
4650M
12
Connector
X pulse motor encoder 5-pin white
Y pulse motor encoder 5-pin blue
Work clamp pulse motor encoder 5-pin black
Foot switch 10-pin
Operation panel 8-pin
Machine head switch 3-pin
Home position sensor assembly 12-pin
STOP switch 6-pin
Valve harness 12-pin
Valve harness 5-pin
Programmer relay harness 8-pin
Solenoid selection harness 4-pin
Thread trimming cylinder sensor harness 16-pin
BAS-300G-484, BAS-300G-484 SF
1. Gently tilt back the machine head.
2. Pass the cord bundle through the hole
in the work table.
3. Loosen the two screws (1), and then
open the cord presser plate (2) in the
direction of the arrow and pass the
cord bundle through the opening
together with the following cords.
• Two-pedal foot switch (3)
• Operation panel (Do not pass the
ground wires through the hole.)
• Solenoid valve assembly
4. Securely connect the connectors as
indicated in the table below.
4649M
Connection location on
main P.C. board
P20 (X-ENC)
P4 (Y-ENC)
*
2
P5 (P-ENC)
P6 (FOOT)
P1 (PANEL)
P9 (HEAD-SW)
P8 (SENSOR1)
P13 (HEAD)
P12 (AIR1)
P26 (AIR3)
P7 (PRG)
P3 (CUTTER)
P23 (EX-IN1)
Lock the cord
clamp securely.
Cord clamp
(3)
(3)
(3)
(3)
(3)
(4)
(4)
(4)
(4)
(4)
(3)
(4)
(Continued on next page)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bas-300g-484

Table of Contents