TP-Link JetStream TL-SL3428 Installation Manual page 8

L2 managed switch
Hide thumbs Also See for JetStream TL-SL3428:
Table of Contents

Advertisement

L2 Managed Switch
03
Introduction
Grounding Terminal
Power Socket
Figure 1-2
Grounding Terminal
The Switch already comes with lightning protection mechanism. You can also ground
the Switch through the PE (Protecting Earth1 cable of AC cord or with Ground Cable.
For detailed information, please refer to Chapter 3 Lightning Protection.
Power Socket
Connect the female connector of the power cord here, and the male connector to
the AC power outlet. Please make sure the voltage of the power supply meets the
requirement of the input voltage (100-240V~ 50/60Hz1.
Caution: Please use the provided power cord.
L3428
Rear Panel of TL-S

Advertisement

Table of Contents
loading

Table of Contents