Edelbrock 3550 User Manual page 5

Pro-flo fuel injection system
Table of Contents

Advertisement

FUEL REQUIREMENTS
Because the Pro-Flo system uses an Oxygen sensor, you must use unleaded fuel only. Leaded fuels will damage the O
sensor. If you do use
2
leaded fuel in your vehicle, do not install the O
sensor and do not operate the vehicle in the closed loop fuel mode.
2
AUTOMATIC TRANSMISSION CHECK
For best performance, economy, and emissions, the shift point must be checked before and after the manifold change.
NOTE: This check should be performed ONLY at a sanctioned drag strip or test track.
With the shifter in Drive, accelerate to wide open throttle from a standing start. Hold in this position, noting speedometer MPH when the
transmission makes the first 1-2 shift. After the Pro-Flo system has been installed, make the same test, again noting MPH of this first shift.
If adjustment is necessary, we recommend use of the Edelbrock Throttle, Cruise Control, & Transmission Kick-Down Mounting Bracket #8031.
The Turbo 350 and Turbo 200 feature a window to accommodate user adjustment of shift points at WOT.
The transmissions in certain vehicles require precise adjustments. We recommend that you consult a reputable transmission shop for final
adjustments once the Pro-Flo system has been installed. Incorrect shift points can result in transmission damage.
ENGINE CLEANING
Edelbrock recommends that the Pro-Flo system be installed on a clean engine in order to prevent dirt from falling into the engine lifter valley or
intake ports.
1. Cover ignition. Use engine degreaser and a brush to thoroughly clean the manifold and the area between the manifold and valve covers.
2. Rinse with water and blow dry.
EXHAUST MANIFOLD HEAT RISER VALVE
If your vehicle is equipped with an exhaust manifold heat riser valve (typically located on the passenger side of the vehicle below the exhaust
manifold), remove the valve for proper operation. If applicable, any air injection tubes must be removed and holes in the exhaust manifold
plugged for proper operation.
HEADERS
For best performance, headers are recommended. For this application, header primary tube diameter should be 1-3/4 inch, approximately 31
inches long and terminating into a 3 inch collector. The remainder of the exhaust system should consist of dual exhaust and tail pipes, at least 2-
1/4 inches in diameter with low back pressure mufflers.
COOLING SYSTEM
The minimum requirements for the thermostat are 180° but the ideal thermostat is 195°. When the vehicle is at 175 or below, system will stay
in cold start mode and not perform properly.
5
©2005 Edelbrock Corporation
Pro-Flo EFI Installation Instructions
Rev. 10/05
Brochure No. 63-0115

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3551

Table of Contents

Save PDF