Download Print this page

Dell PowerEdge 4300 Installation Instructions Manual page 4

Smb connector and scsi cable strain relief kit installation instructions
Hide thumbs Also See for PowerEdge 4300:

Advertisement

2
SMB Connector and SCSI Cable Strain-Relief Kit Installation Instructions
3.
If your system supports the GSO-slot bracket, perform steps 4 and 5; otherwise,
go to step 6 for instructions on installing the PCI-slot bracket.
4.
For GSO-slot brackets, locate the GSO slot on the system's back panel (at the
upper right-hand side as viewed from the back) and remove the tab for the slot.
5.
From inside the chassis, orient the SMB connector as shown in Figure 1 (for
6300 systems) or Figure 2 (for 4300 systems) and insert it into the tab opening. On
the back panel, secure the SMB connector with the screws that came in the kit.
NOTE: Be sure not to over-tighten the screws.
SMB connector
(SDS_SMB)
system
board
        

SMB
connector
! "
GSO slot
SMB cable

Advertisement

loading

This manual is also suitable for:

Poweredge 6300