Attaching The Cable-Management Arm Retainer; Replacing The Rack Doors - Dell PowerEdge 2900 Installation Manual

Rack installation guide
Hide thumbs Also See for PowerEdge 2900:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Attaching the Cable-Management Arm Retainer

The cable-management arm retainer keeps the cable-management arm in place. To attach the cable-
management arm retainer:
1 Connect the release latch on the cable-management arm retainer to the tab on the outer slide
assembly. See Figure 1-10.
NOTE:
Attach the cable-management arm retainer to the side opposite of where you attach the cable-management
arm (see Figure 1-10).
2 Fold the cable-management arm retainer until it locks into place behind the cable-management arm.
To unlock the cable-management arm retainer:
1 Press the blue button on the cable-management arm retainer while lifting the retainer arm.
2 Rotate the arm of the retainer to an open position.
Figure 1-10. Cable-Management Arm Retainer
1
release latch on cable-
management arm retainer
4
metal tab

Replacing the Rack Doors

See the procedures for replacing doors in the documentation provided with your rack cabinets.
This completes the rack installation of your system.
20
Rack Installation Guide
back of system
2
cable-management arm retainer
2
1
4
3
blue button
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents