Prepare Hot Water Line; Water Line Connection - GE GDT550HSDSS Installation Instructions Manual

Built-in dishwasher
Hide thumbs Also See for GDT550HSDSS:
Table of Contents

Advertisement

Available languages

Available languages

Installation Preparation

PREPARE HOT WATER LINE

shaded area shown in Figure F.
cable and drain hose. Or, cut an additional 1-1/2" diameter
hole to accommodate the water line. If power cord with plug
is used, water line must not pass through power cord hole.
1-1/2" Dia.
Hole
Shut-off
Valve
Hot
2"
From
19" From Wall
Cabinet
Cabinet Face
Figure F

Water Line Connection

as under the sink. (Optional, but strongly recommended and
may be required by local codes.)
the hot water inlet line, using no less than 3/8" copper tubing.
Route the line as shown in Figure F and extend forward at
least 19" from rear wall.
Turn page to begin dishwasher installation.
4"
6"
2" From Floor
CAUTION:
Do not remove wood base until you are ready to install the
dishwasher. The dishwasher will tip over when the door is
opened if base is removed.
PRECAUCIÓN:
No quite la base de madera hasta que esté listo para instalar el
lavaplatos. Si se quita la base, el lavaplatos se volcará cuando
se abra la puerta.
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents