HP 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch Installation Manual page 22

Fabric clustering system 24-port 4x fabric copper switch installation guide, march 2005
Hide thumbs Also See for 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch:
Table of Contents

Advertisement

ProLiant Linux Installation Overview & Planning
Install HP Fabric Clustering System Switches
Figure 2-5Rail-to-Switch Attachment Locations
Bezel end
Figure 2-6 Attach Rail to Switch
Step 3. Repeat steps Steps 1 and 2 on the other side of the switch.
The two sliding rails should still be unattached.
Step 4. Loosely attach the switch with one screw through the front of each rail.
CAUTION
Figure 2-7 Loosely Attach Rail to Rack
CAUTION
22
Temporarily support the switch until the sliding rails are attached.
Do not let the switch hang unsupported from only the fixed rail flanges.
Attach rail to switch in
the (6) locations highlighted in black.
Chapter 2

Advertisement

Table of Contents
loading

Table of Contents