Standard Control Box - Chamberlain LA500 Installation Manual

Elite series vehicular swing gate operator
Hide thumbs Also See for LA500:
Table of Contents

Advertisement

INSTALLATION
For Large Metal Control Box installation, refer to the following page.

STANDARD CONTROL BOX

MOUNT THE CONTROL BOX
The control box MUST be mounted within 5 feet (1.52 m) of the gate operator.
Mount the control box as high as possible for best radio reception. Make sure the
control box is level. NOTE: The expansion board DOES NOT need to be removed for
a wall or column mount installation.
1
Remove the screws and open the control box.
2
Disconnect the connector labeled "Main Board" on the expansion board.
3
Remove the expansion board by removing the screws.
4
Select the mounting holes and remove the knockouts using a screwdriver and
hammer.
5
Secure the control box to mounting surface.
A. Column: Use the provided screws (4).
B. Wall: Use the provided screws (4).
C. Post: Use U-bolts and rubber washers (not provided) to ensure a watertight
seal. Make sure the U-bolts do not protrude more than 3/4 inch from the
control box because this can short the control board.
6
Reinstall the expansion board and connect the "Main Board" connector to the
expansion board.
Expansion Board
WALL OR COLUMN MOUNT
9.13"
13.75"
A
B
16
STANDARD CONTROL BOX
"Main Board"
Connector
POST MOUNT
6.36"
4.38"
3.88"
5.88"
4.88"
2.88"
12.06"
C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

La500-s

Table of Contents