Solar Panel Installation - Chamberlain LiftMaster LA412 Owner's Manual

12 volt dc solar residential swing gate operator
Hide thumbs Also See for LiftMaster LA412:
Table of Contents

Advertisement

SOLAR PANEL INSTALLATION

CONNECT SOLAR PANEL(S) TO OPERATOR
CONTROL BOX
1
Open the control box cover.
2
Disconnect all power and batteries from the control board.
3
Run the solar panel cable to the bottom of the control box. Thread the cable
through the watertight connector and pull the cable through until it reaches the
AC PWR/SOLAR connector on the control board.
4
Tighten the watertight connector on the cable.
5
Attach the solar panel wires to AC PWR/SOLAR input terminal (polarity is
not important). Leave the AC PWR/SOLAR earth ground connection open.
With the batteries still disconnected, the control board should power up if the
solar panel is correctly installed and the sun is shining (the diagnostic LED will
blink).
NOTE: The system is designed to be charged by either an AC plug-in transformer or
a separate solar panel, but not both.
6
Use the cable ties to secure the solar panel cable away from places where it
could be damaged.
NOTE: If the sky is too overcast to allow the solar panel to power up the system,
the panel will need to be verified at another time when the sun is shining. There is no
other way to verify the panel installation.
CONNECT BATTERIES
The batteries are charged in circuit by using the solar panel (provided).
1
Locate the two white battery plugs on the left-hand side of the control box.
2
Connect the plug from the battery to connector on the control board.
NOTES: Batteries will degrade over time depending on temperature and usage. For
best performance, the batteries should be replaced every 3 years. Batteries do not
perform well in extremely cold temperatures.
» CONNECT SOLAR PANEL(S) TO OPERATOR CONTROL BOX
+ CONNECT BATTERIES
1
Solar Panel
2
28
Control Board
2
3
4
Battery Connectors
1
Board Connectors
Battery Connection
AC PWR/
SOLAR
J4
Red
Black
5
6
R182
C1Ø1
D36
SOL
L1
GND
MAGR
C75
D42
ON
OFF
LOCK
F12
LEARN
LOCK /
Z1
R2
XMITTER
BIPART DELAY
R1
GATE 1
C7Ø
D1Ø
BR
C71
C72
GR
C73
WH
18
YL
BL
GATE 1
RD
SET
SET
LEARN
F8
OPEN
CLOSE
LIMITS
LIMIT
LIMIT
Control Board
Z12
TIMER
GATE 2
RUNNING
24V
R9Ø
R1ØØ
BR
R1Ø1
GR
WH
OFF
MAX
OFF
YL
BL
D44
RD
F7
GATE 2
Z4
Q22
D2
R196
R42Ø
R423
F1
F3
K6
R22
JU2
U2
DB1
U4
S
MAX
C13
D129
AC PW
/SOLA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liftmaster la412-s

Table of Contents