Removing Of Major Parts - Sharp LC-15B9U-S - 15" LCD TV Service Manual

Lcd color television
Table of Contents

Advertisement

1. Remove the stand cover fixing screw (1 pc.).
2. Remove the stand fixing screws (4 pcs.).
3. Remove the carrying handle fixing screws (4 pcs.).
4. Remove the terminal cover.
5. Remove the terminal screws (2 pcs.). (LC-13B8U-S)
5. Remove the terminal screws (4 pcs.). (LC-15B8U-S, LC-15B9U-SM)
6. Remove the cabinet B fixing screws (8 pcs.). (LC-13B8U-S)
6. Remove the cabinet B fixing screws (7 pcs.). (LC-15B8U-S, LC-15B9U-SM)
7. Remove the cabinet B after opening from the direction of an arrow.
8. Disconnect all the connectors from all the PWBs.
6
Carrying Handle
3
2
1
Stand Cover

REMOVING OF MAJOR PARTS

Cabinet B
Cabinet A
5
7
5
5
Only for
LC-15B8U-S,
LC-15B9U-SM
6
Only for
LC-13B8U-S
Stand
4
Terminal Cover
Sub PWB
P6700
8
P6701
P6702
8
P6703
8
SC2003 SC2002 SC2001
P3302:15"
P3303:13"
P2001
SC4001
R/C, LED PWB
8
Main PWB
9
LC-13B8U-S
LC-15B8U-S
LC-15B9U-SM
P3403
P3401
P3404
8
8
SC802
CN1
8
SC803
SC801
CN3
CN2
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lc-13b8u-sLc-15b8u-sLc-15b9u-sm

Table of Contents