Creating a To-Do List

Wise Package Studio Reference
expand or collapse all the tool entries, right-click anywhere in the list and select Expand
All or Collapse All.
You cannot edit or delete the task or tool entries, but you can enter notes for each task
entry. To view or edit notes, click the link in the Notes column.
Interpreting a task's status
If a task's tool is run and finished, or if its check box is marked, the task's Result is
Completed.
If a task's check box is cleared, the Result is blank for the task entry and Failed for
the tool entry.
Enterprise Management Server only.
The To Do tab in the right pane of the Projects tab displays to-do items for the current
project. Members of the repackaging team create the to-do items and can assign them a
user and due date. When an item's due date has passed, it is displayed in red.
To-do items differ from tasks in that they are unique to a project. They might represent
actions that don't warrant being entered as a task, or issues that arise during the
project. (Example: Suppose the first task in your project is Analyze vendor package and
a later task is Test package. The person who performs the analysis task can make notes
about issues discovered during the analysis, and enter to-do items to record specific
things the tester needs to do during the testing task.) In a project that has no process,
you can use the to-do list to provide general guidelines for the users who will be working
on the project.
Information on the To Do tab is used to generate the To Do List report.
See
Workbench Reports
Security Setup determines whether you have access to the To Do tab.
To create a to-do list
1.
Click the Projects tab or press Alt+P.
2.
From Active Project, select a project.
3.
Click the To Do tab.
4.
On the first line of the list, click Click here to add a new item and type the to-do
item.
5.
To assign the item to a user, click the User Name column and select a user.
6.
To assign a due date to the item, click the Due Date column and select a date.
7.
When you finish entering the to-do information, click outside the to-do item.
The item is added to the end of the to-do list.
To sort the to-do list, click any column heading.
To delete a to-do item, right-click the item and select Delete.
To mark a to-do item as complete, mark the check box to the left of the item.
Repackaging Applications and Managing Projects
on page 85.