Figure 1-10. Routing The Power Cords - Dell PowerEdge 1800 Hardware Installation Manual

Rack installation guide
Hide thumbs Also See for PowerEdge 1800:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
12
Secure the cables to the cable-management arm:
After connecting the cables to the system, unscrew the thumbscrews that secure the
a
front of the system to the front vertical rail.
Slide the system forward to the fully extended position.
b
Route the cables along the cable-management arm, make any adjustments needed to
c
the cable slack at the hinge positions, secure the cables to the cable-management arm
with the straps, and close the wire covers over the cable-management arm.

Figure 1-10. Routing the Power Cords

13
Slide the system in and out of the rack to verify that the cables are routed correctly and do
not bind, stretch, or pinch with the movement of the cable-management arm.
14
Open the wire cover of the cable-management arm and tighten the straps just enough to
ensure that the cable slack is neither too tight to cause excessive pinching nor too loose, yet
keep the cables from slipping as the system is moved in and out of the rack.
15
Secure the cable-management arm retainer to the back of the rack using the captive
thumbscrews (see Figure 1-8).
1-18
Rack Installation Guide
NOTE:
As you pull the system out to its furthest extension, the slide assemblies will lock in the
extended position. To push the system back into the rack, press the slide release latch on the side
of the slide, and then slide the system completely into the rack.
power receptacle housing
power cord plug

Advertisement

Table of Contents
loading

Table of Contents