NETGEAR GSM7352SNA - Prosafe 48 Port Gigabit L3 Managed Stackable Switch Installation Manual page 13

Managed stackable layer 3 switches
Table of Contents

Advertisement

Managed Stackable Layer 3 Switches GSM7328S, GSM7352S and GSM7328FS Hardware Instal-
Table 2-1. LED Descriptions for GSM7328S (continued)
LED
M1, M2, M3, M4
High-Speed I/O
Modules
(1 LED per
module)
10/100/1000M
Ports
(2 LEDs per port)
SFP Ports
(1Link/ACT LED
per port)
Introduction
Description
XFP Module present or Stacking Adapter present and ACT LED:
XFP Module present LED /ACT
• Off: The 10GbE Adapter is not present.
• Solid green: The 10GbE Adapter is present.
• Blinking green: Packets transmission or reception is occurring on
the port
Stacking Adapter Link/ACT LED
• Off: Stacking module is not present .
• Solid green: Stacking module is present .
• Blinking green: Packets transmission or reception is occurring on
the port .
Link/ACT LED
• Off: No link is established on the port.
• Solid green: A valid link is established on the port.
• Blinking green: The port is sending or receiving packets.
SPD LED
• Off: No link or a valid 10M link is established on the port.
• Solid yellow: A valid 100 Mbps link is established on the port.
• Solid green: A valid 1000 Mbps link is established on the port.
Note: If port 21–24 media is changed to SFP, the RJ-45 LEDs l
change to OFF status.
• Off: No SFP module link is established on the port.
• Solid green: A valid SFP module link is established on the port.
• Blinking green: The port is sending or receiving packets.
Note. If port 21–24 media is changed to copper, the SFP LEDs
change to OFF status.
v1.0, February 2007
2-3

Advertisement

Table of Contents
loading

Table of Contents