Installation Guidelines - Cisco WS-X6148-GE-TX - Switch Hardware Installation Manual

Ucs 6100 series fabric interconnect
Hide thumbs Also See for WS-X6148-GE-TX - Switch:
Table of Contents

Advertisement

Chapter 2
Installing the Cisco UCS 6100 Series Fabric Interconnect
S e n d d o c u m e n t c o m m e n t s t o u c s - d o c f e e d b a c k @ c i s c o . c o m

Installation Guidelines

When installing the Cisco UCS 6100 Series Fabric Interconnect, follow these guidelines:
Note
Caution
Caution
OL-20036-02
Prepare the site as described in the
Plan your site configuration and prepare the site before installing the chassis.
Planning and Maintenance Records,"
Record the information listed in
install and configure the fabric interconnect.
Ensure that there is adequate space around the chassis to allow for servicing and for adequate airflow
(Appendix A, "Technical Specifications,"
Ensure that the air conditioning meets the heat dissipation requirements listed in
"Technical Specifications."
Jumper power cords are available for use in a cabinet. See the
page
B-8.
Ensure that the chassis is adequately grounded. If the chassis is not mounted in a grounded rack, we
recommend connecting both the system ground on the chassis and the power supply ground to an
earth ground.
Ensure that the site power meets the power requirements listed in
Specifications."
If available, you can use an uninterruptible power supply (UPS) to protect against
power failures.
Avoid UPS types that use ferroresonant technology. These UPS types can become unstable
with systems such as the Cisco UCS 6100 Series Fabric Interconnect, which can have
substantial current draw fluctuations because of fluctuating data traffic patterns.
Ensure that circuits are sized according to local and national codes. For North America, the power
supply requires a 15-A or 20-A circuit.
To prevent loss of input power, ensure the total maximum loads on the circuits supplying
power to the fabric interconnect are within the current ratings for the wiring and breakers.
Use the following screw torques when installing the chassis:
Captive screws: 4 in-lb (0.45 N·m)
M3 screws: 4 in-lb (0.45 N·m)
M4 screws: 12 in-lb (1.36 N·m)
10-32 screws: 20 in-lb (2.26 N·m)
12-24 screws: 30 in-lb (3.39 N·m)
Cisco UCS Site Preparation
lists the recommended site planning tasks.
Appendix C, "Site Planning and Maintenance Records,"
lists airflow requirements).
Cisco UCS 6100 Series Fabric Interconnect Hardware Installation Guide
Preparing for Installation
Guide.
Appendix C, "Site
as you
Appendix A,
"Jumper Power Cord" section on
Appendix A, "Technical
2-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents