American Standard PF-A-3 Instruction Manual
American Standard PF-A-3 Instruction Manual

American Standard PF-A-3 Instruction Manual

Oil boiler
Hide thumbs Also See for PF-A-3:

Advertisement

Quick Links

AMERICAN
STANDARD
FORM NO. BP-32237-03
PF-A-3 OIL
BOILER
INSTRUCTION
MANUAL
BOILER-BURNER
UNITS
NOTICE TO INSTALLER AND OPERATOR
THIS BOOKLET MUST BE AFFIXED ON OR
ADJACENT TO THE HEATING EQUIPMENT
PLAINTIFF'S EXHIBIT
SERIES NO. 1B-J2
06890

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PF-A-3 and is the answer not in the manual?

Questions and answers

Summary of Contents for American Standard PF-A-3

  • Page 1 PLAINTIFF’S EXHIBIT PF-A-3 OIL AMERICAN STANDARD BOILER INSTRUCTION MANUAL BOILER-BURNER UNITS NOTICE TO INSTALLER AND OPERATOR THIS BOOKLET MUST BE AFFIXED ON OR ADJACENT TO THE HEATING EQUIPMENT SERIES NO. 1B-J2 FORM NO. BP-32237-03 06890...
  • Page 2: Table Of Contents

    PFA-3 TABLE OF CONTENTS ITEM PAGE General Information ................Setting the Unit ................Chimney or Vent ................Air Supply ................Altitude Corrections ..............Section Assembly ................Boiler Piping ................Assembly of Jacket ................Steam Trim Water Trim ................Burner Installation ................
  • Page 3: General Information

    For special installation problems contact American Standard, Hydronics Department, 25 Rano Street, Buffalo, New York. The units are designed for use with the light oil burner Model 93-0-A/S.
  • Page 4 &i. — PFA-3 «-* a) 4> 4) rt o CD c 4> •" c H > Q a J! 41 4) *> _* m <M £ g — JO r o 3 J ■<* *■4 *c c *■ -' c o jr 4)2 ct»...
  • Page 5 DIMENSIONS NUMBER OF SECTIONS 22 £ ‘6* 22 £ 28 £ 28 j FIGURE 1 - SECTION THRU BOILER WITH FLUSH JACKET FLUSH JACKET FIGURE 2 HUM** Of StCTIOHS 52 i 58 i 1 Mi 06894...
  • Page 6 FIGURE 4 - SUGGESTED BOILER FOUNDATION 06895...
  • Page 7 e boiler was ordered with the assembly split or completely dis- eJnbled (optional arrangements), follow the assembling procedure out- ed below: Assemblv of Sections Place the back section in its approximate final location with regard to the chimney and support it with a suitable prop. Note: If the assembly was ordered split into two parts, then disregard instructions pertaining to the handling of individual...
  • Page 8 APPLY 1/4 IKCH DIAMETER BEAD OP SEALANT TO GROOVES < < FIGURE 8 - PULL-UP ASSEMBLY 06897...
  • Page 9: Boiler Model

    .JTIUK (.Cont ' d. ) Assembly of Sections (Cont'd.) Drive section in place with heavy block of wood, striking blows as squarely as possible over nipples. Draw-up evenly on all tie rod nuts starting with lower tie rods, but only after driving the section up at regular intervals with the heavy block of wood to relieve tension on the tie rod threads.
  • Page 10 TIGUSE 9 - SECTION ASSEMBLAGE WITH TANKLESS WATER HEATER -FIGURE 10 location op CLEANOUT COVER ANCHOR BOLTS 06899...
  • Page 11: Boiler Piping

    PFA-3 .•ECTION ASSEMBLY (cont’d.) >- Hydrostatic Test When boiler sections have been assembled, it is essential that boiler be tested before platework, jacket or piping is installed. Plug all boiler tappings and fill entirely with cold water. To protect and safeguard the accuracy of steam or water gauge supplied DO NOT INSTALL GAUGE UNTIL AFTER TESTING OF BOILER.
  • Page 12 FIGURE 11 - POSITIONING OF DAMPER BRACKET FIGURE 12 - LOCATION OF BURNER PLATE 06901...
  • Page 13: Hot Water

    PFA-3 ST'/.M A"SUPPLY 3" SUPPLY 3" RISERS --ALTERNATE SUPPLY LOCATION 3“RISER . ^’ equalizer ^EQUALIZER - 4* HEAOER 24“ MIN. ABOVE WATERLINE WATERLINE 2” TO ’>0" 2 TO "' •WATERLINE ionp " HARTFORO LOOP 'HARTFORO LOOP FRONT FRONT Ig RETURN 4 a 5 SECTION 6, 7 8 8 SECTIONS MINIMUM PIPING RECOMMENDATIONS STEAM BOILERS...
  • Page 14: Steam Trim

    - ■ / Install the number and series plate on the front Jacket panel with #6 x 1/4" sheet metal screws provided. Install panel by sliding it down behind the flanges of the front burner plate. Attach the bottom strip tc the front panel with two jacket screws.
  • Page 15 FIGURE 14 - TROUT PANEL IN FIGURE 15 - COMPLETELY ASSEMBLED JACKET 06904...
  • Page 16 PFA-3 STEAM > CONTROL TAPPINGS size LOOT IO« CONTROL USED TARRtNGS SAFETY VALVC PRESSURE LIMIT CONTROL "4 PRESSURE RAUOC IMMCRSION ORtRATINO CONTROL Cro* INSTALLATIONS WITH TANKLCSS WATCH MCATCR) •tow-ofr •AUBE BLASS AND LOW WATER CUT-O^F mnw FLOW connection STEAM BOILER FRONT VIEW-SHOWING CONTROL TAPPINGS ALL PURPOSE SECTION...
  • Page 17 TIGUB1 1® - BOILER WITH JACKET EXTENSION 06906...
  • Page 18: Filling Boiler

    JER ffITH JACKET EXTENSION (Cont'd.) Assemble the two extension side panels with the notched edge inserted between the side and front panels. Tighten screws to hold panels in place. Assemble the bottom front tie panel to the two side panels with #10 x 7/8"...
  • Page 19: Cleaning Steam Boilers

    FFA-3 CLEANING STEAM BOILERS The grease used to lubricate the cutting tools during erection of new piping systems serves as a carrier for dirt, with the result that a scum of fine particles and grease accumulate on the surface of the water in all new boilers, while heavier particles may settle to the bottom of the boiler and form sludge.
  • Page 20: Repair Parts

    £RAL MAINTENANCE OF HEATING SYSTEM (Con't.) Clean boiler surfaces at regular intervals. If a hot water radiator is hot at the bottom- but not at the top, it indicates that air has accumulated inside and should be vented. To vent radiator; hold small cup under air vent (located near top of radiator), open vent until water escapes and then close.
  • Page 21 Glycol anti-freeze is sometimes added to system water to protect against freezup. Although American Standard can not recommend this practice, we realize that glycol anti-f-eeze will occasionally be used. Heat transfer through glycol is poorer than through water: use no more than 50 percent glycol in the system.