Download Print this page
American Standard 1-G Installation, Operation And Maintenance Manual
American Standard 1-G Installation, Operation And Maintenance Manual

American Standard 1-G Installation, Operation And Maintenance Manual

Advertisement

Quick Links

AMERiCA]V-c$tai?dard
heating
I
nstallation
M
aintenance
A
merican
G
STANDARD TYPE 1-G
APPROVED BY AMERICAN GAS ASSOCIATION
Notice to Installer and Operator
This booklet must be affixed on or
adjacent to the heating equipment.
A
merican
R
adiator
CORPORATION
PITTSBURGH 30, PA.
A RSS 4916
1
.V-'
S
plumbing
- O
peration
and
M
anual
B
as
oiler
^ Standard
^
19590
,.// /:

Advertisement

loading
Need help?

Need help?

Do you have a question about the 1-G and is the answer not in the manual?

Questions and answers

Summary of Contents for American Standard 1-G

  • Page 1 ,.// /: nstallation peration aintenance anual merican oiler STANDARD TYPE 1-G APPROVED BY AMERICAN GAS ASSOCIATION Notice to Installer and Operator This booklet must be affixed on or adjacent to the heating equipment. ^ Standard merican adiator CORPORATION PITTSBURGH 30, PA.
  • Page 2: General Dimensions

    ERECTING DIRECTIONS A GAS BOILER TYPE 1-G merican GENERAL DIMENSIONS -H D K NO. OF NO. OF NO. OF SECTIONS BURNERS BOILER l-G-4 57 h l-G-5 60 W l-G-6 l-G-7 63 W l-G-8 l-G-9 65 % l-G-IO 19591...
  • Page 3 ♦ ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mi ei can ERECTING Caution On hot water systems, expansion tank should not be installed in cold or exposed place. No valves of any type should be installed in piping between boiler and expansion tank. Sealing system at any time during operation may cause breakage of boiler or radiators.
  • Page 4 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mibicam outside of section only, with red lead. 5. Place center section in position on nipples in end sec­ tion. Drive sections together with heavy block of wood striking section squarely as possible over nipple ports.
  • Page 5 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mebican Testing Before connecting boiler, plug openings, fill boiler with water and subject to not less than 10 lbs. nor more than 30 lbs. pressure. Inspect boiler inside and outside for leakage to insure against breakage from handling and shipping.
  • Page 6 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G memcan Assembly of Piping and Controls 1. Attach manifold brackets to front burner access door frame with hex head screws. 2. Assemble sub-assemblies of manifold, manifold piping, automatic gas valve and gas pressure regulator or automatic pilot valve and attach to boiler.
  • Page 7 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G merican "•cor I’O'1 ran « icmnow - * ‘ rHtHMOcouPi.es loca uamoal SiLOf LOCATIONS 'OR cP CAS - UUAM. CMr®** • *50 fHtRMOCOlA.es »I|IJ BLAIRS ALL OTHER rHEDMOCCXjPI.es *«0 NOTE *S0 THlDUOCOUPLt >S r,< LADCCD OM T J6C .
  • Page 8 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mcmcan Ignition Fic. 7—Burner No. 2 and Pilot Installation-Manual Ignition 19597...
  • Page 9 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mibican 3. Place front jacket panel in position, bottom of panel to rest in back of flange on cast iron panel frame. Flanges of front jacket panel to lap over end jacket panels.
  • Page 10 ERECTING DIRECTIONS A GAS BOILER TYPE LG mehican Steam Boiler Water Boiler Jacket Assembly . 9— Steam Boiler 1. Assemble low water cutoff and water column piping as shown in Fig. 10 and attach to boiler as shown in Fig. 9. Assemble the working mechanism to the low water cutoff with gasket and screws (furnished in separate...
  • Page 11 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mehican Water Boiler 1. Insert temperature bulb element of automatic gas valve in -l-i" tapping near top of left end section. (See Fig. 9). For more sensitive operation discard well before installing split nut and gland.
  • Page 12 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G merican 5. Baso Automatic Pilot Switch 1. Manual Shutoff Valve Assembly 6. Thermocouple Lead 2. Push Button Lighter Box 7. Pilot Burner Bracket Assembly 3. Gas Pressure Regulator 8. Auxiliary Pilot Burner 4. Vent Tube .
  • Page 13 ERECTING DIRECTIONS A * GAS BOILER TYPE 1-G merica MAIN GAS LlhC MAIN GAS L, LIGHTER BOX PUSH-BUTTON BLOCK AT LEAST 1* THICK TO ALLOW FOR DRIP REMOVAL NOTE ALL PIPING SHOWN BELOW SHU1 OFF ALL PIPING SHOWN BELOW SHUT OFF \ALVE NOT SUPPLED BY AR1SS CORP VALVE NOT SUPPLIED BY ARB.SS CORP...
  • Page 14 line to pilot burner. See Fig. 16. MVCHSC ACTtMC LOW MATCH THCMWSTAT LOW LIMIT COWTHOL. 'DCTROrrCA-CSS-ft WAWUAL IOWITIOM WITH MCCHAHICAI. LIMIT Ana" MIHINft PIACAAM TOO ^ft,HAT. A MUtCP CASH AUTOMATIC WLOT SWITCH. OOTTtQ LIM1 MWMnT MAMUAL I6MITI0W WITH HBCHASWCAL LIMIT. OTSTCM UHWC CIHCULATOH WITH AIVCMI ~ AUTOMATIC WLOT TWITCH AWO LOM MATCH CUTOTt Fic.
  • Page 15 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G merican 1. Manual Shutoff Valve 4. Pilot Cock 2. Baso Automatic Pilot Valve 5. Pilot Burner Bracket Assembly 3. Thermocouple Lead 6. Pilot Line Control Connections — 2. Connect thermocouple lead from pilot burner bracket to BASO automatic pilot valve.
  • Page 16 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mebicaw B. Boilers with 2 or 3 pilot burners: 1. Connect pilot line from BASO 500 series valve in main gas line to BASO 808 series pilot valve. Connect pilot line from Vs inch tee at outlet of BASO 808 series valve to pilots.
  • Page 17 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G merican 4. Install front burner access door. Connecting Controls (Manual Ignition; Liquefied Petroleum-Air Gases) 1. Connect pilot line from manual shutoff valve assembly, see Fig. 15, to electric pilot valve. Then connect pilot line from electric pilot valve to pilot burners.
  • Page 18 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G merican 4. Wire according to Fig. 22. 5. Install front burner access door. . 22—Wiring Diagram (Manual Ignition; Liquefied Petroleum-Air Gases) Filling System Caution: Never start boiler unless it is properly filled. (After boiler is in operation make up water should be added slowly ).
  • Page 19 ERECTING DIRECTIONS GAS BOILER TYPE 1-G mebican pilot Adjustment Light boiler as directed in operating instructions and check for gas Adjust pilot flame to extend just over the top of the burner. Pilot leaks. can be adjusted with the screw underneath the cap on the pilot rate cock or with throttling cock, if provided in pilot line.
  • Page 20 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mebican Re-Lighting (Electric Ignition) 1. Set thermostat at lowest temperature. 2. Close manual shutoff valve and pilot cock. 3. Turn off switch in electric line to appliance. 4. Wait 5 minutes. 5. Turn on switch in electric line to appliance.
  • Page 21 ERECTING DIRECTIONS GAS BOILER TYPE 1-G merican Re-Lighting (Manual Ignition; Mfd., Nat. & Mixed Gases) 1. Set thermostat at lowest temperature. 2. Close manual shutoff valve and pilot cock. 3. Turn off switch in electric line to appliance. 4. Wait 5 minutes.
  • Page 22 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G merican Re-Lighting (Manual Ignition; Liquefied Petroleum Gases) 1. Set thermostat at lowest temperature. 2. Close manual shutoff valve and pilot cock. 3. Turn off switch in electric line to appliance. 4. Wait 5 minutes.
  • Page 23 EJECTING DIRECTIONS A GAS BOILER TYPE I-G merican Re-Lighting (Manual Ignition; Liquefied Petroleum-Air Gases) 1. Set thermostat at lowest temperature. 2. Close manual shutoff valve and pilot cock. 3. Turn off switch in electric line to appliance. 4. Wait 5 minutes. 5.
  • Page 24 EHECTING DIRECTIONS GAS BOILER TYPE 1-G merican Pilot Goes Out If the pilot flame is extinguished, the automatic pilot will shut off the automatic gas valve. If boiler is not operating correctly, call Heating Contractor or Gas Company service man.
  • Page 25 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mihican CARE AND ATTENTION In Fall before Starting Boiler Drain system sufficiently to remove sludge in bottom of boiler. not drain more water than necessary to remove sludge. Then refill to proper level as directed above.
  • Page 26 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G mebican General Care of Heating System 1. Keep radiators and convectors clean. 2. Keep system in good repair. It is advisable to have it inspected by your heating contractor at least once a year.
  • Page 27 ERECTING DIRECTIONS A GAS BOILER TYPE 1-G merican All parts of this boiler have been carefully inspected and packed. In case of shortage, make sure that all parts have been re­ moved from shipping container and examine packing material thor­...

This manual is also suitable for:

I-g-4I-g-5I-g-6I-g-7I-g-8I-g-9 ... Show all