American Standard APT-95 Installation & Operation Manual
American Standard APT-95 Installation & Operation Manual

American Standard APT-95 Installation & Operation Manual

Ap oil boiler

Advertisement

AP OIL BOILER
by
A
-Standard
merican
I
-O
nstallation
peration
AND
M
M
aintenance
anual
FOR PACKAGED
vs
OIL HEATING UNITS
ATTENTION
INSTALLER!
THIS MANUAL IS TO BE LEFT WITH
BOILER FOR
THE
HOMEOWNER
A
-Standard
merican
lint la baatlnf • • • first In ^Ivaklaf
- •___, j
.L)
ll
23 1953
FEB
BP-7S0S-AP
Vw J F
a

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the APT-95 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for American Standard APT-95

  • Page 1 AP OIL BOILER -Standard merican nstallation peration aintenance anual FOR PACKAGED OIL HEATING UNITS ATTENTION INSTALLER! THIS MANUAL IS TO BE LEFT WITH BOILER FOR HOMEOWNER -Standard merican lint la baatlnf • • • first In ^Ivaklaf - •___, j 23 1953 BP-7S0S-AP Vw J F...
  • Page 2: American-Standard

    To the homeowner: The American-Standard boiler which has been installed for you is the heart of your hydronlc heating system. Since the performance of your system depends upon the boiler, it has been designed to operate at maximum efficiency. Advanced design, precision engineering, and modern manufacturing techniques are combined in this product to provide you with comfort at a low operating cost and with a minimum of...
  • Page 3 AP OIL BOILER The AP Packaged Boiler comes to you almost completely preassembled; consequently, the installer's major responsibility will be in locating, connecting accessory parts and performing the actual hookup. 10535...
  • Page 4 The APT Packaged Bolder cosies w.; .i 4, or 6 sections. 1=B^R Ratings No. of I=B=R Gross Size Sections Output Btuh APT-95 95 >000 APT-130 130.000 APT-165 165.000 LOCATING BOILER POR INSTALLATION The boiler should be located on a level floor as near the chimney as possible.
  • Page 5 AP OIL BOILER «s Side Fasteners Nails FIG. 10537...
  • Page 6 Remove four hex head bolts securing Doiler to me crate base. 2. Tilt boiler to 3. Pivot boiler on 4. Tilt boiler so rear and to right rear corner, that crate base right. rotate 90°, and can be completely lower to floor. removed.
  • Page 7 CHECK-OFF PARTS LIST FOR APT PACKAGED BOILER Although the APT Packaged Boiler cornea to you assembled, it is necessary to check certain accessory items prior to final hook up. Accessory Box Draft Stabilizer Relief Valve x 4-1/2" Pipe Nipple 3/4" Tee Oil Burner Nozzle Circulator Plange Casket and Bolts...
  • Page 8 SECTION ASSEMBLY SHOWING TAPPINGS FOR FORCED CIRCULATION CONTROL APPLICATION LOCATION SIZE OF CONTROLS ON BOILER TAPPING TEMPERATURE AND < ALTITUDE GAGE PRESSURE RELIEF VALVE AND EXPANSION TANK COMBINATION CONTROL, OPERATING, HIGH LIMIT, CIRCULATOR RELAY ft PRIMARY CONTROL LIMIT CONTROL COMBINATION LIMIT AND REVERSE ACTING CONTROL (FOR INSTALLATIONS WITHOUT TANKLESS WATER HEATER)
  • Page 9 TO CONVENTIONAL EXPANSION TANK OR AIR VENT IF AND RELIEF VALVE FXQ. 4 10541...
  • Page 10 INSTALLING THE APT BOILER After moving the APT Packaged Boiler to the desired location, final Installation procedures should be accomplished as outlined below. Hook up piping. Install relief valve and fittings in top of left-hand end section (See Pig. 4). The upper flange of the circulator should be Installed on the return piping, then bolted to the circulator...
  • Page 11 THERMOSTAT PACKAGED OIL BOILER WITH WATER HEATER WIRING DIAGRAM FOR CONSTANT IGNITION FIO. 5 10543...
  • Page 12 WIRE COLORS B-BLACK HONEYWELL O-ORANGE L4080B R-RED LIVIT W- WHITE CONTROL PACKAGED OIL BOILER LESS WATER HEATER WIRING DIAGRAM •i.a.ism ' CONSTANT IGNITION - CONTINUOUS CIRCULATION thervostat VS£ WIRE COLORS PACKAGED OIL BOILER LESS WATER HEATER WIRING DIAGRAM WITH REVERSE ACTING CIRCULATOR CONTROL AND CONSTANT IGNITION 10544...
  • Page 13 iiuriac rartl o« tO»r **L»n The following procedure should be used to fill a series loop Heatrim system (See Fig. 6). Close all zone valves except the one for the zone to be filled with water and purged of air. Open the drain valve on the boiler.
  • Page 14 CARE OP EO LER WHILE IN OPERATION Keep open type system rilled to x/3 of expansi ■. .. A im:, HOT WATER SYSTEM, THE PRESSURE MUST NOT EXCEED jO LHS., i/ 1. ^OEo, IT MUST' IE RELIEVED IMMEDIATELY AND THE CAUSE uP THE P.-n^hi 0/ ..
  • Page 15 CARE OF BOILER WHILE NOT IN OPERATION At end of heating season, clean boiler thoroughly. Lubricate circulator in aceordanoe with lubrication instructions on decal. Clean and remove flue pipe where feasible. Keep system filled with water; in other words, DO NOT DRAIN BOILER. IF BOILER IS NOT USED DURING VINTER, IT MUST BE FULLY DRAINED TO PREVENT DAMAGE CAUSED BY FREEZING.
  • Page 16: Construction Details

    CONSTRUCTION DETAILS Three different cored section eastings are used to make up the APT Packaged Boiler (See Pig. 8). Left-hand end section with 2“ supply tapping, and "Eliminaire." Right-hand end section. Center section. PLATE WORK Burner Plate and Door These are integral components and made of sheet steel with block insulation.
  • Page 17: Side View

    TO EXPANSION TANK OR AIR VENT PRESSURE RELIEF VALVE *”17* REQUIRED FOR REMOVAL OF WATER HEATER------- v THERMOSTAT CLEAN RETURN FLOOR tr LINE FRONT VIEW SIDE VIEW BOILER NUMBER FLUE PIPE OIA APT-95 2»i APT-130 20 r APT-165 PIQ. 8 10549...
  • Page 18: Combustion Chamber

    COMBUSTION CHAMBER The APT Boiler has a refractory combustion chamber. OIL BURNER The Model DH-5R oil burner is used with the APT Boiler. CONTROLS The APT Boiler makes use of a light-sensing primary control. Otherwise, controls for the APT Packaged Boiler are conventional. JACKET Jacket design for the APT Packaged Boiler is conventional as with otljer AR&SS boilers.

This manual is also suitable for:

Apt-130Apt-165

Table of Contents