FT-294 Newport Dove Fountain (2 pcs)
capable of holding 270 pounds within approximately a 1 square foot footprint.
ensuring that it is level.
cord through the channel in the bottom.
it fills the pump well. Make sure the cord is in the channel for a level installation.
FT-294B
29"x12"
260 lb
5. See enclosed stopper assembly instructions and complete before
continuing.
hose.
the pump water outlet and tighten the clamp.
the copper pipe protruding from the bottom of the water feature (FT-294A).
FT-294A
9.5"x6.75
6 lb
#10 compression stopper
4mm Allen Wrench
12" length ½" non-kink black tubing
2" long 5/8" clear tubing
PK120
Wedges (3)
Hose Clamps (3)
1. Make sure you are assembling your fountain on a level surface that is
2. Position the basin (FT-294B) where the fountain is to be installed,
3. Feed the pump cord all the way through the hole in the basin and run the
4. Leave enough cord that you can work with the pump, but not so much that
6. Attach the 2" long 5/8" wide clear tubing to one end of the non kink black
7. Place a hose clamp over the 5/8" clear tubing.
8. Insert the end without the clear tubing of the 1/2" non kink tubing onto
a. Note – one of the hose clamps may be placed on the tubing
prior to installation as a flow restrictor if necessary
9. Place the other end of the 1/2" non kink tubing with the clear tubing onto
10. Coil the tubing up under the water feature (FT-294A)
11. Place water feature into bowl.
12. Fill basin with approximately 3 gallons of water.
Note – do not allow pump to run dry as it will cause damage to
a.
the pump.
Pump Kit and Parts List
Revised July 18, 2016

Advertisement

loading
Need help?

Need help?

Do you have a question about the Newport Dove FT-294B and is the answer not in the manual?

Questions and answers

Summary of Contents for Campania International Newport Dove FT-294B

  • Page 1 FT-294 Newport Dove Fountain (2 pcs) 1. Make sure you are assembling your fountain on a level surface that is capable of holding 270 pounds within approximately a 1 square foot footprint. 2. Position the basin (FT-294B) where the fountain is to be installed, ensuring that it is level.
  • Page 2 FT-294 Newport Dove Fountain (2 pcs) - G E N E R A L F O U N T A I N T I P S - Install fountains on a level surface. You will need a properly grounded 110-volt (AC only) GFCI protected receptacle near the fountain for your pump.