Download Print this page

Advertisement

Quick Links

INFRARED SAUNA SERIES
Installation and Operating Instructions
Tylö® Kiruna™ 1
Tylö® Kiruna™ 2

Advertisement

loading
Need help?

Need help?

Do you have a question about the Kiruna 2 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety Information
Construction and Installation Safety
Details safety precautions for building and installing the sauna, including electrical and structural guidelines.
User and Operational Safety
Covers user safety during operation, including risks like hyperthermia and proper usage guidelines.
Part List and Tool Requirements
Part List
Lists all components included in the sauna packaging, detailing box contents and identification labels.
Tool Requirements
Specifies the necessary tools for assembly, such as screwdrivers and levels.
IR Room Assembly
Laying the Floor Panel
Instructions for correctly positioning and preparing the sauna floor panel for assembly.
Installing Back Wall Section
Guidance on attaching the back wall panel to the floor and aligning it with mounting points.
Installing Left Wall Section
Steps for installing the left wall panel, connecting it to the floor and back wall sections.
Installing Right Wall Section
Steps for installing the right wall panel, connecting it to the floor and back wall sections.
Installing Bench Skirt
Procedure for fitting and securing the bench skirt into its designated position.
Installing Bench Seat
Instructions for placing and securing the main bench seat within the sauna structure.
Beneath Bench Electrical Connections - Right Corner
Details wiring connections for the right corner beneath the bench, connecting various cables to the distribution plate.
Beneath Bench Electrical Connections - Left Corner
Details wiring connections for the left corner beneath the bench, connecting cables to the distribution plate.
Installing Front Wall
Steps for attaching the front wall panel, including connecting cables and securing brackets.
Installing Door Handle
Procedure for assembling and installing the door handles and associated hardware.
Installing Ceiling
Instructions for lifting and securing the ceiling panel into place on the assembled walls.
Ceiling Electrical Connections - Back Left Corner
Wiring instructions for the back left ceiling corner, connecting wall cables to ceiling cables.
Ceiling Electrical Connections - Front Left Corner
Wiring instructions for the front left ceiling corner, connecting wall and RJ11 cables.
Ceiling Electrical Connections - Front Right Corner
Wiring instructions for the front right ceiling corner, connecting wall cables to ceiling cables.
Connecting Power
Guidance on connecting the sauna's power cord to the appropriate electrical receptacle.
Operating the Control
Applying Power
Instructions on how to turn the sauna control on and operate basic functions.
Setting Duration and Temperature
Details on adjusting the sauna's bath time and temperature settings via the control panel.
Lighting Operation
Guide to operating the sauna's internal lighting system, including color and brightness adjustments.
Bluetooth® Audio (Optional)
Information on connecting and using the optional Bluetooth audio system with the sauna.
Wi-Fi Operation (Optional)
Register a New Account
Steps for creating a user account within the Tylö App for Wi-Fi control.
Pairing Information
Instructions for pairing the Tylö App with the sauna control unit via Bluetooth.
Troubleshooting
Control Touch Pad Indicators Not Illuminated
Troubleshooting steps when the sauna's control panel indicators are not lighting up.
Room Not Heating
Diagnosing and resolving issues where the sauna room is not reaching the desired temperature.
Door Rubbing or Binding
Steps to address problems with the sauna door sticking or binding during operation.