Download Print this page
Elkay LZSTL8WS Installation, Care & Use Manual

Elkay LZSTL8WS Installation, Care & Use Manual

Versatile bottle filling stations & coolers

Advertisement

Quick Links

EZSTLDWS*1D EZSTLRDWS*1D EZSTL8WS*1D, 2D, 3D EZSTLR8WS*1D LZSTLDWS*1D LZSTLRDWS*1D LZSTL8WS*1D, 2D, 3D LZSTLR8WS*1D
Buy at
INSTALLATION, CARE & USE MANUAL
EZ
& LZ™ Series Versatile Bottle Filling Stations & Coolers
EZ™ & LZ™ Serie versatil Botella Bombas y Enfriadores
EZ™ & LZ™ Stations versatile de Remplissage de Bouteille Série et Refroidisseurs
*Versatile Cooler Model LZSTL8WSLK
configuration as shippe
*Versatile cooler design allows units to be
installed either left-hand high and right-hand low
or left-low and right high.
Basin change may be required. See desired
rough-in to help determine if the basin change is
necessary.
| 855-558-9600 | BottleFillingStations.com
Manual de Instalación, Cuidado y Utilización
Manuel d'installation/entretien/utilisation
Page 1
*Versatile Cooler Model LZSTL8WSLK
alternate installations
1000001733 (Rev. J - 06/16)

Advertisement

loading
Need help?

Need help?

Do you have a question about the LZSTL8WS and is the answer not in the manual?

Questions and answers

Summarization of Contents

Hanger Brackets Installation
Cooler Installation Procedure
Hanging the cooler onto the installed hanger brackets.
Unit Start Up and Stream Adjustment
Initial unit startup and stream height adjustment steps.
Exterior Panel Cleaning Guidelines
Procedures for safely cleaning the cooler's exterior panels.
Service Instructions
Lower and Upper Shroud Removal
Steps for removing shrouds for access to internal components.
Bubbler Assembly Service
Instructions for servicing the bubbler, including removal and reinstallation.
Push Bar Switch Information
Details on the regulator, switches, and push bar operation.
Bottle Filler Installation Instructions
Mounting Plate and Filler Assembly
Attaching the mounting plate and assembling the bottle filler.
Filter and Final Connections
Installing the filter and making final water/electrical connections.
Testing and Power Up Procedures
Steps for checking leaks, powering the unit, and testing functionality.
Control Board Programming
Software Verification and Button Access
Verifying software version and locating the programming button.
Filter and Unit Configuration Settings
Resetting filter monitor and configuring unit type/filter capacity.
Sensor Range and Bottle Count Reset
Adjusting IR sensor range and resetting the bottle dispensing count.
Moving Bottle Filler & Basin to Left Side
Refrigerated Cooler Side Procedure
Steps for moving filler/basin on the refrigerated cooler side.
Non-Refrigerated Cooler Side Procedure
Steps for moving filler/basin on the non-refrigerated cooler side.
Continued Assembly Instructions
Swapping Shroud Drain Parts
Procedure to swap drain parts between basins in the shroud.
Cooler Side Reassembly and Precautions
Reconnecting components and taking precautions during reassembly.
Wrapper and Trim Kit Installation
Left Hand Wrapper Installation
Instructions for installing wrappers on the left side of the unit.
Right Hand Wrapper Installation
Instructions for installing wrappers on the right side of the unit.
Plumbing Diagrams for EZ Bi-Level Coolers
Standard Bi-Level Pressurized Plumbing Diagram
Diagram of the standard pressurized bi-level cooler plumbing.
Post-Filter/Filler Plumbing Diagram
Plumbing diagram after filter installation and filler line addition.