Download Print this page
Villeroy & Boch Oberon 2.0 UBQ180OBR9CD00V-01 Installation Instructions Manual
Villeroy & Boch Oberon 2.0 UBQ180OBR9CD00V-01 Installation Instructions Manual

Villeroy & Boch Oberon 2.0 UBQ180OBR9CD00V-01 Installation Instructions Manual

Freestanding bathtubs quaryl

Advertisement

Quick Links

Freestanding bathtubs Quaryl
Montageanleitung
DE
Installation instructions
EN
Instrucciones de montaje
ES
Instructions de montage
FR
Istruzioni per il montaggio
IT
Montagehandleiding
NL
RU
ZH
AR
BG
Návod k montáži
CS
Monteringsvejledning
DA
Paigaldusjuhend
EE
EL
Asennusohje
FI
Uputa za montažu
HR
Szerelési útmutató
HU
Petunjuk pemasangan
ID
JA
KO
Montavimo instrukcija
LT
Montāžas instrukcija
LV
Monteringsanvisning
NO
Instrukcji montażu
PL
M.VILLEROY-BOCH.COM
Instruções de montagem
PT
Manual de montaj
RO
Návod na montáž
SK
Navodila za montažo
SL
Monteringsanvisning
SV
TH
Montaj kılavuzu
TR
UK

Advertisement

loading
Need help?

Need help?

Do you have a question about the Oberon 2.0 UBQ180OBR9CD00V-01 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Freestanding Bathtub Installation Guide
Initial Information and Warnings
Provides essential preliminary information and safety warnings before commencing installation.
Step 1: Leveling and Preparation
Ensures the installation surface is perfectly level and prepares the mounting points for stability.
Step 2: Sealant Application
Applies sealant to the bathtub base to ensure a watertight seal with the surrounding area.
Step 3: Bathtub Placement
Carefully positions the bathtub into its designated final location.
Step 4: Securing the Bathtub
Fastens the bathtub securely to the floor or mounting structure.
Step 5: Drain and Water Connections
Connects the bathtub's drainage system and water supply lines.
Step 6: Final Positioning and Alignment
Adjusts the bathtub for its final placement and ensures correct alignment.
Step 7: Water Supply Connections
Connects the hot and cold water supply pipes to the bathtub fittings.
Step 8: Filling and Leak Testing
Fills the bathtub with water to thoroughly check all connections for leaks.
Step 9: Sealing Inspection
Inspects all plumbing and sealant points to confirm integrity and prevent water damage.
Step 10: Silicone Sealant Application
Applies silicone sealant around the perimeter of the bathtub base.
Step 11: Final Curing and Completion
Allows the applied sealant to cure for the recommended time to complete installation.
Oval Bathtub Installation
Step 1: Leveling and Preparation
Ensures the installation surface is level and prepares mounting points.
Step 2: Sealant Application
Applies sealant to the bathtub base for a proper watertight seal.
Step 3: Bathtub Placement
Carefully positions the oval bathtub into its final location.
Step 4: Securing the Bathtub
Fastens the oval bathtub securely to the floor or structure.
Step 5: Drain and Water Connections
Connects the oval bathtub's drainage system and water supply lines.
Step 6: Final Positioning
Adjusts the oval bathtub for final placement and alignment.
Step 7: Water Supply Connection
Connects the hot and cold water supply pipes to the oval bathtub.
Step 8: Filling and Leak Testing
Fills the oval bathtub with water to check all connections for leaks.
Step 9: Sealing Inspection
Inspects all plumbing and sealant points on the oval bathtub for integrity.
Step 10: Silicone Sealant Application
Applies silicone sealant around the perimeter of the oval bathtub base.
Rectangular Bathtub Installation (Model 3)
Step 1: Leveling and Preparation
Ensures the installation surface is level and prepares mounting points.
Step 2: Sealant Application
Applies sealant to the bathtub base for a proper watertight seal.
Step 3: Bathtub Placement
Carefully positions the bathtub into its final location.
Step 4: Securing the Bathtub
Fastens the bathtub securely to the floor or structure.
Step 5: Drain and Water Connections
Connects the bathtub's drainage system and water supply lines.
Step 6: Final Positioning
Adjusts the bathtub for final placement and alignment.
Step 7: Water Supply Connection
Connects the hot and cold water supply pipes to the bathtub fittings.
Step 8: Filling and Leak Testing
Fills the bathtub with water to check all connections for leaks.
Step 9: Sealing Inspection
Inspects all plumbing and sealant points for integrity.
Step 10: Silicone Sealant Application
Applies silicone sealant around the perimeter of the bathtub base.
Step 11: Final Curing and Completion
Allows the applied sealant to cure for the recommended time to complete installation.
Rectangular Bathtub Installation (Model 4)
Step 1: Leveling and Preparation
Ensures the installation surface is level and prepares mounting points.
Step 2: Sealant Application
Applies sealant to the bathtub base for a proper watertight seal.
Step 3: Bathtub Placement
Carefully positions the bathtub into its final location.
Step 4: Securing the Bathtub
Fastens the bathtub securely to the floor or structure.
Step 5: Drain and Water Connections
Connects the bathtub's drainage system and water supply lines.
Step 6: Final Positioning
Adjusts the bathtub for final placement and alignment.
Step 7: Water Supply Connection
Connects the hot and cold water supply pipes to the bathtub fittings.
Step 8: Filling and Leak Testing
Fills the bathtub with water to check all connections for leaks.
Step 9: Sealing Inspection
Inspects all plumbing and sealant points for integrity.
Step 10: Silicone Sealant Application
Applies silicone sealant around the perimeter of the bathtub base.
Step 11: Final Curing and Completion
Allows the applied sealant to cure for the recommended time to complete installation.