SEG SOLAR SEG BTD-BG Series Installation Manual

Photovoltaic module(double-glass)

Advertisement

Quick Links

www.segsolar.com
INSTALLATION GUIDE
Photovoltaic Module(Double-glass)
2024 V1.0
SEG SOLAR BORN AND RAISED IN THE USA

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SEG BTD-BG Series and is the answer not in the manual?

Questions and answers

Summary of Contents for SEG SOLAR SEG BTD-BG Series

  • Page 1 INSTALLATION GUIDE Photovoltaic Module(Double-glass) 2024 V1.0 SEG SOLAR BORN AND RAISED IN THE USA...
  • Page 2: Table Of Contents

    www.segsolar.com TABLE OF CONTENTS 1 GENERAL INFORMATION ....................2 1.1 APPLICABLE PRODUCTS ..................2 1.2 PRODUCT IDENTIFICATION ................2 2 SAFETY ..........................3 2.1 GENERAL SAFETY ....................3 2.2 HANDLING SAFETY ....................3 2.3 INSTALLATION SAFETY ..................4 2.4 FIRE SAFETY ......................4 3 INSTALLATION .......................
  • Page 3: General Information

    Non-compliance with these instructions may void the module warranty. 1 GENERAL INFORMATION Thanks for choosing SEG Solar Photovoltaic Modules (hereafter referred to as “PV Module”), This Guide is to give information on how to apply SEG Solar PV modules properly.
  • Page 4: Safety

    www.segsolar.com 2 SAFETY 2.1 GENERAL SAFETY Be careful when unpacking, transporting, and storing the modules. They are subject to breakage if they are not handled and installed properly. It is recommended not to take them out of the packaging until the moment of the installation. During installation, please use soft materials to protect the modules from contacting directly with the ground, concrete or tiles.
  • Page 5: Installation Safety

    www.segsolar.com 2.3 INSTALLATION SAFETY Installation shall be in conformity with UL standard, Safety Standard for Electrical Installations. • Do not disconnect under load. • Do not touch conductive parts of PV modules, such as terminals which can result in burns, sparks and lethal shock whether •...
  • Page 6: Installation

    www.segsolar.com 3 INSTALLATION 3.1 GENERAL INSTALLATION PRINCIPLE Module can be installed in both landscape and portrait modes(as shown in table 1). • Module type Wiring configurations Type 1 166 SEG-XXX-BMB-BG SEG-XXX-BMA-BG Portrait installation one row Type 2 182 SEG-XXX-BMD-BG SEG-XXX-BTD-BG SEG-XXX-BMB-BG SEG-XXX-BTB-BG SEG-XXX-BMA-BG...
  • Page 7: Location And Angle Selection

    www.segsolar.com It is recommended to keep minimum 2cm gap between PV modules for thermal expansion of materials. • Install PV modules appropriately according to corresponding mechanical load need. • 3.2 LOCATION AND ANGLE SELECTION It is recommended to install PV modules where has excellent sunlight resources. In the Northern Hemisphere, the module should typically face south, and in the Southern Hemisphere, the modules should typically face north.
  • Page 8: Clamp Installation

    www.segsolar.com Module type Load(Pa) Installation Drawing Type 1 SEG-XXX-BMB-BG SEG-XXX-BMA-BG +2400/ Type 2 SEG-XXX-BMB-BG +2400/ +5400/ -2400 SEG-XXX-BTB-BG -2400 -2400 (Outer SEG-XXX-BMB-BG (Inner 4 (8 holes) SEG-XXX-BPB-BG holes) Type 4 holes) SEG-XXX-BMA-BG 156&158.75 SEG-XXX-BPA-BG 8 mounting holes SEG-XXX-BMZ-BG SEG-XXX-BMD-BG Type 2 SEG-XXX-BTD-BG SEG-XXX-BMA-BG SEG-XXX-BTA-BG...
  • Page 9 www.segsolar.com In order to ensure that the modules can withstand a downward force of up to 5400 Pa (550 kg/m ), the modules shall be fixed on the bracket with the long side of the module, using a minimum of four clamps. Please make sure to use at least of two purlins behind the modules to support the modules.
  • Page 10: Erthos Pv Module Installation

    www.segsolar.com 3.5 TRACKER INSTALLATION SEG modules also have compatibility with tracker systems in the industry. The maximum load that SEG module can achieve is as listed in Table 4.(For detailed installation drawings and installation method, please refer to installation manual of tracker supplier.) Tracker installation drawing 400mm holes distance...
  • Page 11: Electrical Installation

    www.segsolar.com 3.6.2. Installation Process 3.6.3. Specific Requirement • Modules being installed according to this method must be installed using only mechanical equipment that has been certified by Erthos through a Nationally Recognized Testing Lab(NRTL) such as, but not limited to, UL, Intertek, or TUV. •...
  • Page 12: Grounding

    4.1 CLEANING SEG Solar PV modules require proper cleaning procedures to ensure optimal performance. Professional installers must read and follow these guidelines carefully to prevent death, injury, or property damage. Inappropriate cleaning procedures can void the SEG Solar warranty.
  • Page 13: The Visual Inspection Of The Modules

    Method B: Compressed Air SEG Solar recommends using compressed air to clean soft dirt such as dust from solar modules. However, this method should only be used if it is effective enough to clean the modules considering the on-site conditions.
  • Page 14: Parameters

    www.segsolar.com Please ensure that all cables are firmly connected and kept away from water areas and direct sunlight. 5 PARAMETERS The parameters may be updated from time to time, accurate parameters please check on our website: http://www.segsolar.com or email our technical support team: technic@segsolar.com. PERC and TOPCON Version valid as from March 2024 until a new version is issued by 2024 V1.0...
  • Page 15 SEG SOLAR INC. Email: info@segsolar.com Web: www.segsolar.com SEG Headquarters: 10625 Telge Road, Houston, TX 77095...

Table of Contents