Installation
Guide
7.4kW SOCKET SINGLE PHASE :
EVWC2S7G (7.4KW / WI-FI / LAN)
EVWC2S7GG (7.4KW / WI-FI / LAN / 4G)
EVWC2S7GGR (7.4KW / WI-FI / LAN / 4G / RFID)
click to navigate directly to the page
Commercial Installation & Commissioning
Contents
Introduction / Box contents
Safety information
Installation & testing
Troubleshooting
Domestic Commissioning
Stage 1 (Installer app)
Domestic Commissioning
Stage 2 (User app setup)
Technical
syncev.co.uk
EVWC2S7G EVWC2S7GG EVWC2S7GGR V2 0124 NH

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EVWC2S7G-01 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Introduction and Contents
Box Contents
Lists all items included in the EV charger package.
Tools Required
Lists essential tools needed for the installation process.
Safety and Electrical Requirements
Safety Information
Essential warnings and guidelines for safe installation and use of the EV charger.
Earthing Requirements
Details on earthing systems, voltage supplies, and earth-neutral fault detection.
Surge Protection
Guidance on surge protection devices and compliance with BS7671.
Isolation and Switching
Mandatory requirements for isolator switches for safety and maintenance.
Installation and Testing
General Installation Requirements
Guidelines on charger placement, mounting height, and structural considerations.
Cable Entry and Glanding
Procedures for cable entry, gland selection, and IP rating maintenance.
Load Balancing Setup
How to install and configure the CT clamp for load balancing.
Final Electrical Testing
Required tests and checks to ensure a compliant electrical installation.
Electrical Installation Steps
Power Isolation and Hole Drilling
Isolate power and prepare fixing holes using the included template.
Cable Entry and Washer Installation
Drill base for cable entry and use supplied washers to maintain IP rating.
Power Connections and Cable Grip
Ensure correct polarity for power connections and fit cord grip.
Connector Insertion and Wiring
Insert power connector securely and wire for load balancing or external meter.
Charger Mounting and Securing
Fix the charger to the base with correct torque and secure the cover trim.
Cover Trim and Securing
Attach the cover trim and secure the charger with a locking screw.
Commissioning Procedures
Commercial Installation & Commissioning
Steps for commercial, workplace, or fleet installation and commissioning.
Domestic Commissioning - Stage 1
Initial setup using the installer app, Bluetooth connection, and network configuration.
Domestic Commissioning - Stage 2
Downloading the Monta app, creating an account, and integrating the charger.
Troubleshooting and Technical Data
Troubleshooting Guide
Interpreting LED indicators and identifying common fault causes.
Technical Specifications
Detailed product specifications including codes, input, and housing.
Technical Support
Contact information for Monta app and BG SyncEV charge-point support.

Table of Contents