Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
NOVAIR Manuals
Air Handlers
CTA 36
Installation, use and maintenance manual
NOVAIR CTA 36 Installation, Use And Maintenance Manual
Hide thumbs
1
Table Of Contents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
page
of
26
Go
/
26
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
Introduction
Pag
Identification of the Unit
Check Operations
Packing and Transport
Inspection of the Goods Received
Movementand Installation
Positioning and Junction of Sections
Unit Cleaning
Safety Prescriptions
Connections
Ducts Linkage
Coils Connection
Condensate Drain Pans
Siphoning
Connection of Humidification Sections
Honeycomb Humidification System
Humidification with Nozzles
Connection of Steam Humidification
Connection of Plate Heat Recovery Units
Connection of the Fan Section
Safety Equipment
Preparatory Operations for Commissioning
Belts Tension
Bearings Lubrification
Antivibration Bench
Electrical Connections
Motors
Electric Heaters
Electric Pumps
Filtration
Synthetic or Metallic Filters
Bag Filters
Absolute Filters
Autoroll Filters
Activated Carbon Filters
Units Commissioning
Operational Maintenance Layout
Monthly Checks
Yearly Checks
Units Dismanthling
Localization of Failures
Advertisement
Quick Links
1
Table of Contents
2
Identification of the Unit
3
Motors
4
Operational Maintenance Layout
Download this manual
AIR HANDLING UNITS SERIES:
ESA
TVH
STS
CTA
INSTALLATION USE AND
MAINTENANCE MANUAL
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the CTA 36 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for NOVAIR CTA 36
Air Handlers NOVAIR CTA Series Installation, Use And Maintenance Manual
(26 pages)
Air Handlers NOVAIR ESA Series Installation, Use And Maintenance Manual
(26 pages)
Air Handlers NOVAIR CTA 48 Installation, Use And Maintenance Manual
(26 pages)
Air Handlers NOVAIR CTA 76 Installation, Use And Maintenance Manual
(26 pages)
Summarization of Contents
Introduction
1.1 IDENTIFICATION OF THE UNIT
Summary of unit identification plate details.
1.2 CHECK OPERATIONS
Details of pre-delivery inspection checks.
1.3 PACKING AND TRANSPORT
Procedures for unit packing and safe transport.
1.4 INSPECTION OF THE GOODS RECEIVED
Steps for inspecting delivered goods for damage or discrepancies.
1.5 MOVEMENT AND INSTALLATION
Guidelines for safe lifting and moving of units.
1.6 POSITIONING AND JUNCTION OF SECTIONS
Requirements for unit placement and joining modular sections.
1.7 UNIT CLEANING
Instructions for initial cleaning before unit operation.
Safety Prescriptions
2.1 GENERAL SAFETY PRECAUTIONS
Essential safety rules for handling and operating air handling units.
Connections
3.1 DUCTS LINKAGE
Guidelines for connecting air ducts to the unit.
3.2 COILS CONNECTION
Procedures for connecting water or steam coils.
3.3 CONDENSATE DRAIN PANS
Installation and maintenance of condensate drain pans.
3.4 CONNECTION OF HUMIDIFICATION SECTIONS
Connecting humidification systems.
3.5 CONNECTION OF STEAM HUMIDIFICATION
Connecting steam humidification systems.
3.6 CONNECTION OF PLATE HEAT RECOVERY UNITS
Connecting plate heat recovery units.
3.7 CONNECTION OF THE FAN SECTION
Connecting the fan section.
3.7.1 SAFETY EQUIPMENTS
Electrical connection of safety switches and protection nets.
3.7.2 PREPARATORY OPERATIONS FOR COMMISSIONING
Pre-commissioning checks for fan sections.
3.7.3 BELTS TENSION
Correct mounting and checking of belt tension.
3.7.4 BEARINGS LUBRICATION
Lubrication schedule for bearings.
3.7.5 ANTIVIBRATION BENCH
Removing locking plates from the antivibration bench.
3.8 ELECTRICAL CONNECTIONS
Electrical connections for unit components.
3.8.1 MOTORS
Features and connection of electric motors.
3.8.2 ELECTRIC HEATERS
Connecting and setting electric heaters.
3.8.3 ELECTRIC PUMPS
Connecting and operating electric pumps.
Filtration
4.1 SYNTHETIC OR METALLIC FILTERS
Description and maintenance of synthetic/metallic filters.
4.2 BAG FILTERS
Details on bag filters and their replacement.
4.3 ABSOLUTE FILTERS
Information on absolute filters and their replacement.
4.4 AUTOROLL FILTERS
Description of autoroll filters and their regeneration.
4.5 ACTIVATED CARBON FILTERS
Handling and replacement of activated carbon filters.
Units Commissioning
5.1 COMMISSIONING PROCEDURES
Steps and checks required before starting the units.
Operational Maintenance Layout
6.1 MONTHLY CHECKS
Specific checks to be performed monthly.
6.2 YEARLY CHECKS
Specific checks to be performed yearly.
Units Dismantling
7.1 DISMANTLING PROCEDURES
Step-by-step instructions for safely dismantling the air handling units.
Localization of Failures
8.1 TROUBLESHOOTING GUIDE
Guide to identifying and resolving common unit malfunctions and symptoms.
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the CTA 36 and is the answer not in the manual?
Questions and answers