INSTALLATION
Continued
Test Pressures Equal To or Less Than
1/2 PSIG (3.5 kPa)
1. Close equipment shutoff valve (see Figure 14).
2. Pressurize supply piping system by either
opening propane/LP supply tank valve for
propane/LP gas or opening main gas valve
located on or near gas meter for natural gas,
or using compressed air.
3. Check all joints from gas meter for natural or
propane/LP supply to equipment shutoff valve
(see Figure 15 or 16). Apply a noncorrosive
leak detection fluid to all joints. Bubbles form-
ing show a leak.
4. Correct all leaks at once.
PRESSURE TESTING HEATER GAS
CONNECTIONS
1. Open equipment shutoff valve (see Figure 14).
2. Open main gas valve located on or near gas
meter for natural gas or open propane/LP
supply tank valve.
3. Make sure control knobs of heater are in the
OFF position.
4. Check all joints from equipment shutoff valve
to thermostat gas valve (see Figure 15 or 16).
Apply a noncorrosive leak detection fluid to
all joints. Bubbles forming show a leak.
5. Correct all leaks at once.
Equipment
Shutoff
Valve
Figure 14 - Equipment Shutoff Valve
Equipment Shutoff Valve
Propane/LP
Supply Tank
Figure 15 - Checking Gas Joints
(Propane/LP Gas Only)
14
Open
Closed
Thermostat Gas
Valve or Control
Valve Location
www.desatech.com
113183-01B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cdr3924pt

Table of Contents