On June 10 , 2005 Weir-Jones Engineering Consultants Ltd. (WJEC) was retained by
Opticom Technologies Inc. to perform a set of temperature tests on three of its Model CC-02-4.3
CCTV cameras. The primary objective in testing the cameras was to verify their functionality at low
temperatures. This was done by powering down the units and cooling them to -40°C and -50°C and
verifying that they power-up and function properly at the two temperatures. The testing of the units
was performed on June 10 , 2005.
2.0

TEMPERATURE TEST EQUIPMENT

2.1

Test Equipment

The equipment required for the temperature tests was an environmental chamber
(see Figure 1). The specifications of the chamber are as follows:
Manufacturer:
Model:
Temperature range:
Maximum transition rate:
Controller:
The controller for the environmental chamber was calibrated on April 1 , 2005 by TMC Services
Inc. in Elk River, Minnesota, using instruments there were traceable to NIST. The calibration
certificate of the controller is provided in Appendix 1.
Figure 1:
Weir-Jones Engineering Consultants Ltd. environmental chamber.
Weir-Jones Engineering Consultants Ltd.
th
Envirotronics
EVH33-2-705
-73°C to +177°C
7°C per minute
manufactured by Micristar
st
Controller
1
30140-REP-001-0.wp9

Advertisement

loading