Download Print this page

OPTICOM CC-02-4.3 Manual page 2

Temperature testing
Hide thumbs Also See for CC-02-4.3:

Advertisement

AUTHORIZATION
The work described in this report was authorized by David Boyd of Opticom Technologies
th
Inc. on June10 , 2005. The report was prepared by Paul Chong, P.Eng.
Paul Chong, P.Eng.
Project Engineer
th
Dated at Vancouver, June 14 , 2005.
Weir-Jones Engineering Consultants Ltd.
30140-REP-001-0.wp9

Advertisement

loading