For The Plumber - Scotsman FME24RLM Service Manual

Double system rl
Table of Contents

Advertisement

FOR THE PLUMBER

Water Supply:
The recommended water supply line is 3/8" O.D.
copper tubing, with a minimum operation pressure
of 20 PSIG, and a maximum of 80 PSIG. Connect
to cold water using the male flare connection at the
back of the machine. Install a shut off valve in an
accessible space between the ice maker and the
water supply.
SHUT OFF
VALVE
WATER INLET
BIN DRAIN
FLOOR DRAIN
CONFORM TO ALL APPLICABLE CODES
Drain System:
All drains are of the gravity type, and must have a
minimum of 1/4" fall per foot of horizontal run. The
drains must be installed to conform to local
plumbing codes. The use of a vent at the machine
and at the bin will allow the system to drain
properly. Use only rigid tubing for drains; insulation
of the bin drain is recommended.
November 2000
Page 5
Double System RL
3/8" MALE FLARE
VENT THIS DRAIN
FIELD
SUPPLIED
WATER FILTER
3/4" FPT

Advertisement

Table of Contents
loading

Table of Contents