FOUNDATION
Requirements for a stable and level foundation for the greenhouse.
FRONT ELEMENTS
Instructions for assembling the front section of the greenhouse.
DOOR GABLE END
Instructions for assembling the gable end where the door will be installed.
ROOF MIDDLE BARS
Instructions for installing the middle bars of the roof structure.
ROOF VENTS
Steps for assembling and installing the roof vents.
SLIDING DOORS
Detailed instructions for assembling the sliding doors.
GLAZING OVERVIEW
General guidelines and important notes before glazing the greenhouse.
FINAL STEPS
The final assembly steps to complete the greenhouse structure.
Need help?
Do you have a question about the Athene 11900 and is the answer not in the manual?
Questions and answers