Fröling RS 8 Installation And Operating Instructions Manual

Fröling RS 8 Installation And Operating Instructions Manual

Pellet suction system
Table of Contents

Advertisement

Quick Links

Installation and operating instructions
Pellet suction system RS 4 / RS 8
Model
Fire protection package
Translation of original German version of installation and operating instructions for technicians and
operators.
Read and follow all instructions and safety instructions.
All errors and omissions excepted.
M1890721_en | Edition 14/05/2021

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RS 8 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety
2.1 Hazard Levels and Warnings
Explains hazard levels (DANGER, WARNING, CAUTION, NOTICE) used in the documentation.
2.2 Permitted Uses and Fuels
Defines the intended use of the system and specifies approved fuel types.
2.3 Personnel Qualifications and PPE
Details required qualifications and protective equipment for assembly and operating staff.
2.7 Design Information and Standards
Outlines design considerations and lists relevant industry standards to be observed.
2.7.2 Installation Site Requirements
Specifies crucial requirements and considerations for the installation location.
Technical Information
3.1 Dimensions and Recommended Distances
Provides detailed dimensional data and spacing requirements for system components.
Store Layout and Construction
4.1 Size of Store Space
Specifies the required capacity for the pellet storage area based on heating load.
4.2 Store Layout Elements
Details requirements for buffer mat, door planking, and sloping floor.
4.5 Filling Couplings Installation
Information and steps for installing fuel filling couplings and their positioning.
4.6 Probe Distribution (4 Probes)
How to arrange four suction probes for different store sizes and configurations.
4.7 Probe Distribution (8 Probes)
How to arrange eight suction probes for different store sizes and configurations.
4.8 Optional Store Pyramids
Optional components to improve pellet removal efficiency from the store.
Assembly
5.1 Materials Supplied - RS 4
Lists all components included in the delivery for the RS 4 model.
5.2 Materials Supplied - RS 8
Lists all components included in the delivery for the RS 8 model.
5.3 Transport, Storage & Position
Guidelines for transporting, temporarily storing, and correctly positioning components.
5.6 Fire Protection Package Installation
Steps for preparing wall openings and fitting the fire protection package.
5.7 RS 4 Suction System Installation
Detailed steps for mounting and installing the RS 4 pellet suction unit.
5.8 RS 8 Suction System Installation
Detailed steps for mounting and installing the RS 8 pellet suction unit.
5.9 Suction Probes and Lines Installation
Instructions for installing suction probes and connecting the pellet and air lines.
5.10 Sealing Fire Protection Panels
Methods for sealing fire protection panels to prevent dust escaping from the store.
5.11 Hose Feed-through and 5.12 Pyramids
Routing hoses through to the boiler room and installing optional store pyramids.
5.13 Hose Line Assembly and Equalisation
Guidelines for laying, handling, and ensuring potential equalisation of hose lines.
5.14 Hose Clips and 5.15 Electrical Connection
Guidance on fitting optional hose clips and connecting the electrical components.
5.16 Controller Configuration
Steps to configure the discharge system settings via the controller menu.
5.17 System Upgrade Procedure
Procedure to upgrade existing manual RS4 pellet suction systems to automatic operation.
Operating the System
6.1 Cleaning and Inspection
Procedures for cleaning and inspecting the suction unit for maintenance.
6.2 Decommissioning and Disposal
Steps for taking the system out of service, disassembly, and proper disposal.

Table of Contents