Preface
Documentation Audience
Target audience for the manual's content.
Documentation Conventions
Describes command and GUI conventions used in the document.
Provide Documentation Feedback
Instructions on how to provide feedback on the documentation.
Installation Preparation
Switch Models and Product Codes
Lists applicable switch series, their models, and product codes.
Installation Environment and Safety
Safety Recommendations
Critical safety advice to prevent equipment damage and personal injury.
Ventilation and Heat Dissipation
Requirements for proper airflow and clearance to prevent overheating.
Moisture and Humidity Control
Guidelines for maintaining optimal environmental conditions to prevent damage.
Lightning and ESD Protection
Measures to protect against lightning strikes and electrostatic discharge.
Cable Routing and Cleanliness
Best practices for cable management and maintaining a clean environment.
Corrosive Gas Prevention
Concentration limits for gases that can damage equipment.
Site Selection and Power Requirements
Installation Site Categories
Definitions and examples for various environmental suitability categories.
Pollution Source Considerations
Guidelines on proximity to potential pollution sources for site selection.
Power Supply and Voltage Checks
Ensuring correct voltage and power source availability before installation.
Installation Tools and Accessories
Laser Safety Guidelines
Safety precautions for devices with laser components.
Required Installation Tools
List of tools the user must provide for installation.
Installation Accessories List
Details of included accessories and their applicability.
Switch Installation Methods
Hardware Installation Overview
General flowchart of the switch installation process.
Rack Mounting Methods
Overview of different methods for mounting the switch in a rack.
Rack Mounting with Front Brackets
Detailed steps for mounting the switch using front brackets.
Rack Mounting with Front and Rear Brackets
Detailed steps for mounting the switch using front and rear brackets.
Workbench Mounting Procedure
Instructions for securely mounting the switch on a workbench.
Switch Grounding Procedures
Grounding Importance and Methods
Explanation of grounding's role and available connection methods.
Grounding via Grounding Strip
Procedure for connecting the switch to a grounding strip.
Grounding via Earth Conductor
Procedure for grounding the switch using an earth ground conductor.
Verify Grounding Connection
Steps to confirm the grounding connection is secure and effective.
Power Supply Management
Power Supply Installation and Removal Overview
General process for installing and removing power supply units.
Installing/Removing Power Supply (Type 1)
Procedure for installing/removing specific power supply models (e.g., CA-70A12).
Installing/Removing Power Supply (Type 2)
Procedure for installing/removing other specific power supply models.
Connecting Power Cords
Connecting Built-in Power Supply Cord
Steps to connect the power cord to a built-in power supply.
Connecting Specific Power Supply Cords
Procedures for connecting power cords to various specific power supply models.
Final Installation Verification
Pre-Power On Installation Checklist
Final checks required before powering on the installed switch.
Initial Switch Access and Setup
Connecting to Configuration Terminal
Steps to establish a connection for initial configuration.
Console Cable Connection Options
Details on using DB9-to-RJ45 and USB-to-RJ45 console cables.
Setting Terminal Configuration Parameters
Configuring terminal emulator settings for switch management.
Switch Startup and Basic Operation
Pre-Startup Checklist
Items to verify before powering on the switch.
Powering On the Switch
Procedure for turning on the switch and its initial startup.
IRF Fabric Configuration and Setup
IRF Fabric Setup Overview
Introduction to creating a virtual switch fabric with multiple devices.
Planning IRF Fabric Setup
Key considerations for designing and planning an IRF fabric.
Connecting IRF Member Switches
Methods for physically connecting switches in an IRF fabric.
Configuring Basic IRF Settings
Steps to configure essential parameters for IRF functionality.
Connecting Physical IRF Ports
Detailed instructions for linking IRF ports with cables.
Verifying IRF Fabric Setup
Procedures to confirm the IRF fabric is functioning correctly.
Maintenance and Troubleshooting
Power Supply Failure Troubleshooting
Steps to diagnose and resolve power supply issues.
Fan Tray Failure Issues
Identifying and addressing problems with the switch's fan tray.
Configuration Terminal Display Problems
Troubleshooting issues with terminal display during configuration.