INSTALLATION
8
Built-In Fireplace Installation (Cont.)
INSTALLATION
Continued
BUILT-IN FIREPLACE INSTALLATION
Built-in installation of this fireplace involves installing fireplace
into a framed-in enclosure. This makes the front of fireplace flush
with wall. Follow the instructions below to install the fireplace in
this manner. If installing a built-in mantel above the fireplace, you
must follow the clearances shown in Figure 9, page 9. If using for
built-in installation off of the floor, follow clearances shown in
Figure 4, page 7.
Height
Actual
26"
Framing
26
7
/
"
8
1. Frame in rough opening. Use dimensions shown in Figure 6
for the rough opening.
If installing in a corner, use dimensions shown in Figure 7 for
the rough opening. The height is 26
the wall opening above.
2. An optional blower accessory is available (see Accessories,
page 29). There are two options for connecting blower to elec-
trical source.
Option one:
Have a licensed electrician install a properly
grounded, three-prong 120-volt electrical outlet at fireplace
location. Locate outlet inside the framed enclosure. Blower
power cord will plug into this outlet.
Option two:
Have a licensed electrician connect blower to elec-
trical source at junction box inside fireplace.
If using option one, have electrical outlet installed at this time.
If using option two, do not connect blower to electrical source
at junction box until step 6.
3. Install gas piping to fireplace location. This installation includes
an approved flexible gas line (if allowed by local codes) after
the equipment shutoff valve. The flexible gas line must be the
last item installed on the gas piping.
4. Carefully set fireplace in front of rough opening with back of
fireplace inside wall opening.
5. Attach flexible gas line to fireplace gas regulator. See Con-
necting Fireplace to Gas Supply, pages 13 and 14.
6. If the optional blower has been installed connect blower to
electrical source.
Option one:
Route blower electrical cord through side or rear
access door of fireplace. Plug electrical cord into electrical outlet.
Have a licensed electrician connect blower to elec-
Option two:
trical source at junction box inside fireplace.
7. Bend four nailing flanges on outer casing with pliers (see
Figure 8, page 9).
For more information, visit www.desatech.com
For more information, visit www.desatech.com
Front Width Depth
Bottom
26
3
/
9
1
/
"
3/4"
4
2
26
7
/
"
10
1
/
"
3/4"
8
2
1
/
" which is the same as
8
8. Attach fireplace to wall studs using nails or wood screws
through holes in nailing flange.
9. Check all gas connections for leaks. See Checking Gas Con-
nections, pages 14 and 15.
IMPORTANT: When finishing your firebox, combustible materi-
als such as wall board, gypsum board, sheet rock, drywall, plywood,
etc. may be butted up next to the sides and top of the firebox.
Combustible materials should never overlap the firebox front fac-
ing. Firebox should not be placed on top of carpet or other kinds of
fibrous material.
WARNING: Do not allow any combustible materi-
als to overlap the firebox front facing.
7
26
"
/
8
Figure 6 - Rough Opening for Installing in Wall
36
5
"
/
8
26
51
Figure 7 - Rough Opening for Installing in Corner
Nails or Wood
Screws
Figure 8 - Attaching Fireplace to Wall Studs
10
1
"
/
2
3/4" Off
The Floor
7
26
"
/
8
Minimum
25
7
"
/
8
7
"
/
8
3
"
/
4
Nailing
Flanges
111410-01C