Reimers R 20 Installation, Operating, & Maintenance Instructions

Electric steam boilers

Advertisement

REIMERS ELECTRA STEAM, INC.
PHONE:540-662-3811
MODELS R & RH 10 THRU 30
ELECTRIC STEAM BOILERS
INSTALLATION, OPERATING, &
MAINTENANCE INSTRUCTIONS
READ THIS FIRST
READ ALL INSTRUCTIONS BEFORE INSTALLATION/OPERATION.
ENSURE BLOWDOWN PROPERLY/SAFELY PIPED.
STAND CLEAR OF SAFETY VALVE & SCALDING STEAM.
VALVES/PIPES ARE HOT WHEN UNDER PRESSURE OR HEATING UP – DO
Reimers Electra Steam Boilers are heated by one or more immersion-type heating
elements. Automatic controls are provided to maintain pre-set operating pressure and to
keep the water supply at the proper level. Safety features include automatic low-water
cut-off, automatic pressure control, safety pop-off valve and visible water level gauge.
Each boiler is designed to meet the requirements of ASME standards, and is
individually inspected and stamped by an authorized National Board Insurance Inspector.
All boilers are registered with the National Board of Boilers and Pressure Vessel
Inspectors.
4407 MARTINSBURG PIKE
CLEAR BROOK, VA 22624-0037
FAX:540-665-8101
10/17/2000
RB SERIES
CAUTION:
NOT TOUCH
G:\INSTR\RB20IN
_____
MODEL:
__________
SERIAL #:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the R 20 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Critical Safety and Pre-Operation Guidance
READ THIS FIRST
Crucial preliminary instructions and safety warnings for immediate attention before use.
Boiler Operation Cautions
Key safety warnings regarding hot surfaces, steam, and proper procedures during operation.
Limited Warranty Information
Warranty Period and Exclusions
Details the warranty duration, what is covered, and common exclusions.
Claim Process and Liability Limitations
Outlines the procedure for submitting claims and the company's liability limits.
Installation Procedures
Location, Water Supply, and Steam Outlet
Guidelines for boiler placement, clearances, water supply connection, and steam line setup.
Condensate Return and Electrical Hookup
Covers condensate return systems, safety valve piping, and electrical wiring requirements.
Blowdown Valve and Initial Setup
Instructions for piping the blowdown valve and initial steps for starting the boiler.
Boiler Operation
Startup and Water Fill Process
Steps to begin operation, including filling the boiler with water and turning on power.
Pressure Adjustment and Shutdown
Guidance on adjusting operating pressure and the correct procedure for shutting down the boiler.
Maintenance and Troubleshooting
Routine Maintenance Tasks
Covers blowdown frequency, safety valve testing, and pressure adjustment.
Component Testing and Replacement
Details tests for elements, controls, gauge glass, and procedures for fuse/element replacement.
Water Feed and Fuse Issues
Troubleshooting for water feed problems, low water cutoff, and fuse failures.
Parts and Installation Parameters
Parts List
Comprehensive list of available replacement parts with part numbers and descriptions.
Recommended Installation Clearances
Guidelines for boiler placement, clearances, and dimensions for safe and efficient installation.