Advertisement

Quick Links

®
R&S
ZCxxx
Converters
Getting Started
(;ÛÁÆ2)
1177515602
Version 05

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZC90 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety and regulatory information
Labels on the product
Information about labels on the product casing.
Warning messages in the documentation
Explanation of warning messages used in the documentation.
Korea certification class B
Information regarding Korea certification class B.
Preparing for use
Unpacking and checking
Steps for unpacking and verifying the equipment upon delivery.
Choosing the operating site
Guidance on selecting an appropriate operating location for optimal performance.
Setting up the converter
Instructions for physically setting up the converter for use.
Considerations for test setup
Factors to consider when planning a test setup for measurements.
Connecting the converter to the DC supply
Procedure for connecting the converter to its power supply unit.
Switching the converter on
Step-by-step instructions for powering on the converter.
Connecting the converter to the VNA via USB
How to connect the converter to the Vector Network Analyzer using a USB cable.
Instrument tour
Test port adapter (waveguide flange)
Description of the test port adapter and its waveguide flange interface.
Output power-adjusting knob
Details about the knob used to manually adjust the output power.
Rear panel
Overview of connectors and controls located on the rear panel.
RF connections
Connection procedure
Step-by-step guide for establishing RF connections between devices.
Input connectors (RF IN, LO IN)
Description of the RF input and Local Oscillator input connectors.
Output connectors (MEAS OUT, REF OUT)
Description of the measurement and reference output connectors.
Adaption kits R&S ZCAKN
Information on specific R&S ZCAKN adaptation kits for connections.
Basic operation
Required equipment
List of necessary equipment for performing basic operations.
Configuration and measurement steps
Overview of the configuration and measurement process steps.
Configuring the converter setup
Detailed steps for configuring the converter setup within the VNA.
Establishing the RF connections
Procedure for establishing RF connections for measurement setups.
Scalar power calibration and leveling (optional)
Optional procedure for scalar power calibration and output leveling.
System error correction
Steps for performing system error correction to ensure measurement accuracy.
Measurement
How to perform measurements using the frequency converter.
Additional information
Supplementary information regarding converter operation and settings.
Maintenance and disposal
Cleaning
Instructions for cleaning the product to ensure longevity.
Disposal
Guidance on proper disposal of electrical and electronic equipment.
A Setup and operation with R&S ZVA/ZVT
A.1 Connecting the RF cables
Procedure for connecting RF cables for R&S ZVA/ZVT setups.
A.2 Basic Operation
Guide to basic operations, required equipment, and measurement principles with R&S ZVA/ZVT.

Table of Contents