Advertisement

O O v v e e r r v v i i e e w w
Introduction
In This Document
Safety is #1
Questions?
Dec 2008
Quick-Start Guide
Congratulations on your purchase of a Smithy machine. With proper setup and
care, your machine should provide many years of quality work and enjoyment.
This guide covers general instructions for several Smithy metal-working machines.
You will receive a detailed operating guide, reference manual, and DVD packed in
with your machine. We recommend keeping this quick-start guide with those items
when they arrive.
Enjoy your Smithy machine!
This document covers basic information that you will need to prepare for the
delivery and to begin setting up your Smithy machine. The topics in this document
include:
Tracking Your Shipment and Preparing for Delivery
Taking Delivery
Opening the Crate
Removing the Machine from the Pallet
Securing the Machine to a Work Bench
Smithy machines have been proven to be safe and reliable. However, if abused or
operated improperly, any machine can cause injury to you or others. Please read
this guide and the operating guide carefully before you start machining. Proper use
will create a safe working environment and prolong the life of your machine.
In this manual, the symbols below draw attention to specific operating issues.
DANGER
! !
If this action is not avoided, it will cause permanent harm to your health,
such as death or serious injury, and it may also cause permanent damage to your machine.
WARNING
! !
If this action is not avoided, it can cause potential harm to your health,
resulting in death or serious injury, and has potential to cause serious harm to your machine.
CAUTION
! !
If this action is not avoided, it may cause potential harm to your health,
such as minor to moderate injury, and may also cause moderate harm to your machine.
For pre-delivery questions not covered in the guide, dial 1-800-476-4849,
Monday through Friday, 8:00 a.m. to 5:00 p.m. (Eastern Standard Time).
Quick-Start Guide for Smithy Metal-Working Machine
Introduction to the Quick Start Guide
Topic
Page
2
4
6
7
11
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Granite 1340 Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

Overview
Introduction to the Quick Start Guide
General guidance for Smithy machines, recommending keeping this quick-start guide with other provided materials.
Tracking Your Shipment and Ordering Smithy Accessories
Track by Phone
Details phone numbers for tracking Smithy shipments via Estes Express, UPS, and U.S. Mail.
Track Online
Provides website addresses for online shipment tracking with Estes Express, UPS, and U.S. Mail.
Track by Email
Explains how UPS can provide automatic shipment updates via email if an address is provided.
Ordering Smithy Accessories
Describes shipping methods for accessories, packaging, and delivery timelines for Smithy orders.
Preparing for Delivery
Work Bench Requirements
Specifies requirements for a sturdy, level work bench supporting the machine, plus up to 300 lbs of accessories.
Clearance and Space
Details recommended working space and clearance around the machine for safe operation and access.
Power Requirements
Outlines electrical circuit requirements, including voltage, amperage, and grounding for the machine's operation.
Taking Delivery
Receiving the Machine
Provides recommendations for picking up the crated machine at a trucking terminal or depot.
Weight and Crate Dimensions
Lists approximate shipping weights and crate dimensions for various Smithy machine models and benches.
Vehicle Recommendations
Suggests suitable vehicles for picking up the machine, considering load capacity and clearance.
Inspecting Crates and Cartons
Instructs on checking crates/cartons for damage upon arrival and documenting any issues with the shipping company.
Opening the Crate
Safety Precautions
Advises wearing gloves and safety glasses, and seeking help for heavy crate covers.
Step-by-Step Unpacking
Details removing packing lists, cutting bands, and checking contents against the packing list.
Moving Your Smithy from the Pallet
Removing with Mechanical Power
Outlines steps for lifting and moving the machine using a hoist or mechanical lift.
Removing without Mechanical Power
Provides instructions for manually moving the machine by disassembling parts for easier lifting.
Securing the Machine to the Work Bench
Mounting Hardware Recommendations
Lists recommended bolts, washers, and nuts for securing the machine to various types of benches.
Aligning the Machine to the Bench
Explains methods for aligning the machine base to mounting holes, using hoists or manual placement.
Bolt Patterns
1200 Series Mounting Bolt Layout
Diagrams showing bolt hole locations for 1200 series machines like Midas and Granite.
1300 Series Mounting Bolt Layout
Diagrams showing bolt hole locations for 1300 series machines like Granite, GN, and IMX models.
Mounting Bolt Layouts
CX-329 & LX-329 Mounting Bolt Layout
Details the mounting bolt footprint and hole specifications for CX-329 and LX-329 models.
CZ-239 Mounting Bolt Layout
Provides the mounting bolt layout specifications for the CZ-239 model.
LZ-1340 Mounting Bolt Layout
Shows the mounting bolt layout dimensions and hole specifications for the LZ-1340 model.

Table of Contents