13.2 Installation space
Requirements for indoor unit placement, ceiling conditions, airflow access, and maintenance room.
13.5 Install the Panel
Instructions for attaching the front panel, including swing motor alignment and screw adjustments.
Drainage test
Procedure to verify drainpipe function, check for leaks, and confirm drain pump operation.
13.7 Wiring
Safety precautions, regulations, and connection guidelines for electrical wiring.
13.7.2 Wiring figure
Diagram illustrating the wiring connections between the air conditioner and wire controller.
13.8 Test operation
Steps for conducting post-installation test runs to verify system functionality and performance.
Need help?
Do you have a question about the MKA-750R and is the answer not in the manual?
Questions and answers