Riello RS 130 E Installation, Use And Maintenance Instructions

Riello RS 130 E Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

Installation, use and maintenance instructions
Forced draught gas burners
Progressive two-stage or modulating operation
20016861
20016862
20016863
Code
Model
RS 70/E
RS 100/E
RS 130/E
20017786 (7) - 05/2012

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RS 130 E and is the answer not in the manual?

Questions and answers

Summarization of Contents

General Information and Instructions
Instruction Manual Details
Information about the manual's content, symbols, and importance for user guidance.
Guarantee and Owner's Responsibility
Details on manufacturer's warranty terms and the owner's duties for burner operation.
Safety and Prevention Measures
Introduction to Safety Protocols
Overview of burner safety compliance, potential dangers, and operational risks.
Personnel Training Guidelines
Requirements for qualified personnel and user responsibilities for safe burner operation.
Technical Description of the Burner
Technical Data and Specifications
Key performance metrics including output, fuel type, and operating conditions.
Electrical Specifications and Model Details
Electrical data, model designations, and associated codes for different burners.
Physical Characteristics and Components
Dimensions, packaging, equipment list, and identification of burner components.
Operation and Control Systems
High altitude operation procedures, control box functions, and actuator details.
Installation Procedures
Installation Safety and Handling
Safety notes, handling, and preliminary checks required before installation.
Burner Mounting and Combustion Setup
Securing burner, blast tube length, and combustion head adjustment procedures.
Gas and Electrical Connections
Gas train assembly, feeding, pressure, and electrical wiring and connection guidelines.
Thermal Relay and Motor Setup
Thermal relay calibration, motor connections, and setting reversible direction.
Start-up, Calibration, and Operation
Pre-Start-up Safety and Operations
Safety for first start-up, operations before start-up, and initial checks.
Burner Start-up and Pressure Calibration
Burner start-up procedure and calibration of air/gas pressure switches.
Final Operational Checks
Verification of burner performance and safety device response during operation.
Maintenance Procedures
Safety and Programmed Maintenance
Safety precautions and recommended frequency for periodic burner maintenance.
Inspection and Cleaning Procedures
Steps for checking gas leaks, filter, flame window, and combustion head.
Burner Opening and Closing
Detailed instructions for safely opening and reassembling the burner unit.
Appendices
Spare Parts List
Comprehensive list of available spare parts with codes for different burner models.
Accessories and Compliance
Information on gas train standards and installer responsibilities for safety devices.
Burner Start-up Report
A standardized form for documenting burner start-up parameters and operational settings.

Table of Contents