Download Print this page

Bourgault XR750 Quick Start Manual

Pre delivery inspection checklist

Advertisement

Quick Links

XR750/770
Date:
Dealership:
Serial #:
Model - Size:
Sept

Advertisement

loading
Need help?

Need help?

Do you have a question about the XR750 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Cart Inspection
Cart Safety Chain and Hitch Tongue
Verify safety chain attachment and correct hitch tongue installation.
Cart Tire Pressure and Wheel Nuts
Check cart tire pressure and torque of wheel nuts.
Hitch Tube and Axle Fasteners
Confirm torque of u-bolt fasteners attaching Hitch Tube to Axle Assembly.
Axle and Hitch Jack Installation
Ensure axle assembly is centered and hitch jack is installed.
Locking Arm Adjustment
Adjust locking arm tabs for evenness with hitch in locked or field position.
Cable Extension Plate Installation
Verify parallel installation of cable extension plates on auto fold loop.
Auto Locking Mechanism and Linkage
Check auto locking mechanism rotation and linkage tension.
Grease Zerks and Hydraulic Lines
Confirm all grease zerks are in place and hydraulic lines are secure.
Hydraulic Line Routing and Cylinders
Check neat routing of hydraulic lines with heat shrink and correct cylinder installation.
Cart Paint Repair
Ensure all paint damage on the cart has been repaired.
Boom Inspection
Boom Tower and Bolt Tightness
Verify tower locations and tightness of tower bolts.
Boom Wheel Bolts and Tire Pressure
Check torque of boom wheel bolts and inflation of boom wheel tires.
Boom Grease Zerks and Hitch Jack
Ensure grease zerks are greased and hitch jack is correctly installed.
Boom Cable Bracket and Wheel Mount
Confirm double plates on cable bracket and correct orientation of wheel mount.
Boom Paint Repair
Ensure all paint damage on the booms has been repaired.
Boom Hydraulic System
Cylinder and Hose Plumbing
Verify neat plumbing of fold and steering cylinders and hose routing.
Cylinder Location and Hose Specifications
Ensure correct cylinder locations and adherence to hydraulic hose bend specs.
Parallel Arm Cylinder Plumbing
Check plumbing of parallel arm cylinders and hose routing for motion range.
Safety Lights and Decals
Confirm safety lights installation and Bourgault part number decals on cylinders.
Decal Application
Decal Drawing and Hitch Decal
Ensure XR-Decal drawing is attached and hitch decal is correctly placed.
Decal Placement and Condition
Verify all decals are in proper location and good adhering condition.
Harrow Adjustment and Inspection
Tine Angle Indicator and Linkage
Check tine angle indicator adjustment and linkage bolt tightness.
Tine Holder and Parallel Arm Pins
Verify tine holder installation and parallel arm pin orientation.
Slow Moving Sign and Paint Repair
Confirm slow moving sign installation and any paint damage repair.
Final Pre-Delivery Inspection
Paint Touch-ups and Hydraulic Leaks
Confirm paint touch-ups are complete and no hydraulic leaks are present.
Transport Circuit Sequencing
Verify proper sequence of transport cylinders and boom wheels during fold/unfold.
Tine Angle Circuit and Manual
Check tine angle circuit function and ensure operator's manual is with machine.
Cable Wing Stop and Safety Lights
Inspect cable wing stop assembly and verify safety light function.
Locking Arms and Fold/Unfold Test
Confirm locking arms lock when unfolding and perform a fold/unfold test.
Transport Sequence Valve Operation
Transport Sequence Valve Function
Understand the transport sequence valve's role in folding and unfolding.
Adjusting Sequence Valves
Learn the procedure for adjusting transport sequence valves for proper operation.
Troubleshooting Guide
Transport Fold/Unfold Sequence Issues
Address problems where transport fold or unfold occurs out of sequence.
Boom Folding Problems
Troubleshoot issues with the boom not folding down out of transport position.
Auto-Fold Arm Engagement
Resolve issues with auto-fold latches not engaging or disengaging properly.
Hydraulic Schematics and Manifold
Transport Circuit Diagram
Review the schematic for the transport hydraulic circuit.
Transport Sequence Manifold Details
Understand the components of the transport sequence manifold.
Fold Sequence Cartridge (SCCA)
Information on the SCCA cartridge for machine fold sequence.
Unfold Sequence Cartridge (SCEA)
Information on the SCEA cartridge for machine unfold sequence.
Check Valve Cartridge (CKEB)
Details on the CKEB pilot operated check valve for unfold sequencing.