Advertisement

Quick Links

BOILER CONSTRUCTION SC
Z A K Ł A D M E T A L O W O - K O T L A R S K I
28-100 Busko-Zdrój, Owczary, ul. Przemysłowa 3
Phone: +48 41 378 46 19, Fax: +48 41 370 83 10
TECHNICAL - START - UP DOCUMENTATION
of water boiler's for heating installations
`
SAS UWG type
adopted for black coal combustion of nut coal
BOILER
SAS UWG
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UWT and is the answer not in the manual?

Questions and answers

Summarization of Contents

Use of Boiler
Use of Boiler
Boilers of SAS UWG type are designated for water installations of central heating systems.
Boiler Construction Description
Boiler Construction Description
Describes the modern construction of the SAS UWG type heating device with lower combustion of solid fuels.
Technical Data
Technical Data
Presents basic energetic parameters of the boiler in tables and drawings.
Fuel
5.1. Fuel
Details the basic fuel for SAS UWG boilers, specifying black coal of nut grade.
5.2. Alternative Fuel
Lists alternative fuels, including mixtures of coal grades and long flame fuels like wood.
Boiler Assembly Guidelines
6.1. Requirements for Boiler-Room
Outlines essential requirements for the boiler room, including ventilation and door specifications.
6.2. Boiler Arrangement
Provides recommendations for boiler placement regarding space and fire-proof flooring.
6.3. Connecting Boiler to the Chimney
Details the procedures for connecting the boiler to the chimney, including height and section requirements.
6.4. Connecting Boiler to Heating Installation
Explains how to connect the boiler to the heating system, emphasizing protection against corrosion.
Operation and Installation Guidelines
7.1. Filing with Water
Describes the process of filling the boiler and heating installation with water, ensuring air removal.
7.2. Firing Up a Boiler
Details the step-by-step procedure for firing up the boiler, including fuel loading and air regulation.
7.3 Burning
Explains the normal operation of the boiler, including refueling, raking the grate, and regulating combustion.
7.4. Cleaning the Boiler
Details the cleaning procedures for the combustion chamber, convection channels, and chimney duct.
7.5. End of Heating Season
Provides instructions for preparing the boiler at the end of the heating season, including cleaning and conservation.
Technical and Operating Parameters of SAS UWG Boiler
Technical and Operating Parameters
A comprehensive table listing technical and operating parameters for SAS UWG boilers.
Boiler Construction Scheme of SAS UWG (9-14 kW)
Boiler Construction Scheme (9-14 kW)
Illustrates the construction scheme of SAS UWG boilers in the 9-14 kW range with numbered components.
Boiler Construction Scheme of SAS UWG (17-29 kW)
Boiler Construction Scheme (17-29 kW)
Shows the construction scheme for SAS UWG boilers in the 17-29 kW range, detailing components.
Terms of Safe Exploitation
Terms of Safe Exploitation
Lists essential rules and guidelines for maintaining safe operation of the boiler.
States of Improper Boiler's Functioning
States of Improper Boiler's Functioning
Identifies common problems, their causes, and recommended remedies for boiler malfunction.
Terms of Delivery
Terms of Delivery
Outlines the conditions and included items for commercially delivered boilers.
Boiler's Recycling
Boiler's Recycling
Provides guidance on how to recycle the boiler unit according to regulations.
Terms of Warranty
Terms of Warranty
Details the manufacturer's warranty terms, coverage periods, and conditions for the SAS UWG boiler.
Service Repairs
Service Repairs
A section dedicated to information or procedures related to service and repairs for the boiler.
Warranty Card
Warranty Card
A template for the warranty card, detailing the boiler's specifics and warranty duration.

Table of Contents