  • Page 2 Introduction Introduction About Think Power Thank you for using the PV grid-connected inverter of Think Power. Established in 2011, Wuxi Xinqi Power New Energy Technology Co., Ltd. is located in Wuxi, the Changjiang River delta plain hinterland, close to the Changjiang River in the north and Taihu Lake in the south, whose geographical location is superior.
  • Page 3 ●S3600TL ●S4400TL ●S5000TL the importance. These important notices must be fully understood and followed.
  • Page 4: Table Of Contents

    Introduction Contents Symbols on the inverter Contents The inverter is attached with some labels related to operation safety. Please 1 Safety instruction … …………………………………………………………………1 don’t install the device before carefully reading through and fully 1.1 Before installation…………………………………………………………… 1 understanding these labels. 1.2 During installation……………………………………………………………...
  • Page 5 Contents Contents 3.6 Electrical connection………………………………………………………14 5.4.3 Power generating mode…......…………………………35 3.6.1 Electric and electrical system structure……………………………14 5.4.4 Protection mode....……..………………………………35 3.6.2 Structure of the communication system……………………………16 5.4.5 Fault state………………………………………………………………36 3.6.3 Wiring terminals and cable specification……………………………18 5.5 LCD panel mode….……...………...……………………………………… 37 3.6.4 Steps for electrical connection………………………………………20 5.6 LED blink table ….……...…………..………………………………………...
  • Page 6: Safety Instruction

    Safety instruction 1 Safety instruction Please contact Think Power if you have any problems . Song Series inverters are designed, manufactured and tested as per international safety standards. However as an electrical and electric product, it must be installed, operated and maintained strictly according to related safety notices.
  • Page 7: During Installation

    Safety instruction Safety instruction 1.2 During installation Do NOT restart the inverter before all the hazards have Notice been removed. Please contact your local dealer and Keep the PV array covered and the DC circuit breaker always have licensed trader do the repairing. OFF.
  • Page 8: Product Description

    Product description Product description BOOST MPPT1 FULL BRIDGE INVERTER GEID-CONNECT RELAY 2 Product description 2.1 Product applicability BOOST MPPT2 By Song series inverter, the DC voltage generated in the PV array can be transformed into AC voltage and supplied to the grid. The PV power generating system consists of PV arrays,inverters, meters and a public CPU2 CPU1...
  • Page 10: Installation

    I nstallation I nstallation 3 I nstallation 3.3 Preparation before installation 3.3.1 U npacking and checking 3.1 S afety instruction The product is carefully tested and checked before transportation, however it is The DC voltage at the P V array and the AC voltage still possible to be damaged during transportation, please check the device at the grid side are both higher than the safe voltage.
  • Page 11: Preparation For Tools

    Installation Installation Detailed requirement for installation position: 3.3.2 Preparation for tools The inverter with a protection level of IP65 can be installed in the open air. The following tools will be used for installing the inverter: ※ The inverter can not be installed under direction sunshine, or the internal ※...
  • Page 12 I nstallation I nstallation Tab.3-2: Effective spacing dimensions 4 ) Fix the back board to the wall using the tapping screws tightly.     Fig.3-7 Fig. 3-5 5 ) K eep the inverter tilts slight upward, and attach it to the wall bracket slightly to the top of its final position, and then visually check if the inverter is correctly installed on the bayonet.
  • Page 13: Inverter

    Installation Installation 3.6 Electrical connection There are 2 independent MPP trackers in inverter. You can choose multi-strings input connection(Fig3-11) and common-string input connection(Fig3-12). We After the inverter is correctly installed on the wall or support, the next step is the recommend that choose multi-strings to harvest max.
  • Page 14: Structure Of The Communication System

    I nstallation I nstallation 3.6.2 S tructure of the communication system S ong series supports two flexible communication modes: RS 485 and optional wireless WI FI . The topological structure of the communication connection is introduced below.  S ee 3.6.3 for the detailed wiring terminals and 3.6.4 for the detailed wiring ...
  • Page 15: Wiring Terminals And Cable Specification

    I nstallation I nstallation 2) AC terminals WI FI wireless communication is functioning within 400m in an opening distance, but interference and barrier shall be put into consideration because the actual transmission Notice distance is influenced by the installation field and external interference.
  • Page 16: Steps For Electrical Connection

    Installation Installation 4) Cables of the following specification will be equipped by the user. DC cable between the inverter and the assembly shall be the Tab.3-5: Recommended cable specification special PV cable. The voltage drop from the terminal box to the inverter is about 1-2%.
  • Page 17: Steps For Ac Connection

    Installation Installation 2) Using the crimping tool and put terminal into mold of crimping tool, The terminal size is 5) The terminal is crimped well with PV cable wire. 4.0mm, so put it into the mold of 4-6mm. Fig.3-28 Fig.3-31 3) Process crimping.
  • Page 18 Installation Installation 4) Screw down the threaded sleeve and the pressure screw. 1) Put the threaded sleeve and pressure screw of AC wring terminal and the AC wire. Fig.3-34 Fig.3-37 5) The AC connection finished. 2) Wire the AC wire refers to below instructions. 3.6.4.3 DC/AC terminal connection: Screw the green-yellow wire to the ground terminator in the AC Connector Screw the blue wire to the N(Natural) terminator in the AC Connector.
  • Page 19: Connect Rs485 As Per The Following Steps

    Installation Installation 3.6.4.4 Connect RS485 as per the following steps. 4) Press down the top of the terminal by a flat screw driver, insert the cable into 1) Remove the 6 screws on the inverter bottom cover by wrench, and open the the terminal A/B.
  • Page 20: Earthing Requirement

    Installation Trial operation 4 Trial operation 3.6.5 Earthing requirement 4.1 Check before operation The inverter is a device with no transformer, neither the positive nor the negative pole of the PV assembly DC side Caution Necessary safety check must be performed before the can be earthed, or the inverter will not work normally, or even Warning inverter is electrified for trial operation!
  • Page 21: Human-Machine Interaction

    Human-machine interaction Human-machine interaction 5 Human-machine interaction 5.1 LCD interface Symbol Description It means the PV panel (transform the luminous energy into DC) It indicates the current power, unit: KW. It indicates the electric quantity of the current day, unit: KWh. It indicates the total electric quantity, unit: KWh or MWh.
  • Page 22: Main Interface

    Human-machine interaction Human-machine interaction 5.3.1 Main interface 5.3.3 Device management 1) Device list zone: names of all registered devices with the communication 1) Device registration: a new device can be added into the device list by the status (LIVE or OFF) are displayed by a module tree, and one of the device can user.
  • Page 23: Standing-By Mode

    Human-machine interaction Human-machine interaction See the following content for the meaning of each mode. See the following content for the meaning of each mode. 5.4.1 Standing-by mode 5.4.3 Power generating mode When the external condition satisfies the power generating condition, and the When the DC voltage is higher than 70V but lower than 100V, the inverter after the self-checking gets through, the inverter will enter into the power will enter the sleep mode.
  • Page 24: Led Blink Table

    Human-machine interaction Human-machine interaction 5.4.5 Fault mode 5.5 LCD panel power saving mode If any internal fault is detected by the inverter, the inverter will stop power The LCD will enter sleep mode if no operation last for 2 minutes , to wake it up generating and enter the fault mode, in this case fault indicator on the LCD panel please tap on the shell slightly.
  • Page 25: Troubleshooting And Maintenance

    Troubleshooting and maintenance Troubleshooting and maintenance 6 Troubleshooting and maintenance Tab. 6-1: Protection code and solution 6.1 Troubleshooting Displayed code Protection description Recommended solution This part introduces the common fault and solving steps, provides troubleshooting method and skills to the user, and helps the user identify and 1.Cut off the DC breaker and check if solve some common fault of the inverter.
  • Page 26: Daily Maintenance

    Troubleshooting and maintenance Troubleshooting and maintenance Tab. 6-2: Fault code and solution 6.2 Daily maintenance It is unnecessary to maintain the inverter in normal conditions but it is necessary to make sure the inverter is not covered by dust. Displayed code Recommended solution Fault description ●Cleaning...
  • Page 27: Uninstallation

    Uninstallation Uninstallation 7 Uninstallation 7.2 Packing The inverter shall be treated as per the following steps if it is to be replaced or Please pack the inverter with the original package if possible. If the original out of service. package is not available, please pack with a carton satisfying the following 7.1 Uninstalling steps requirement.
  • Page 28 General Parameters S3600TL S4400TL S5000TL Dimension(L/W/H)[mm] 480(L)X400(W)X180(H)(mm) Model name S3600TL S4400TL S5000TL Weight[kg] 25kg DC side/Input parameters Night Mode support Optional Max. DC power[W] 3600 4400 5000 Night Mode support < 0.2 Max. DC voltage [Vdc] Transformerless Isolation type Min. System start/Feed in voltage [Vdc]...
  • Page 29: Quality Assurance

    Quality assurance Quality assurance 9 Quality assurance 9.3 Warranty card 9.1 Warranty Policy Tab. 9-1: Warranty card For our customers we provide 5 years standard warranty from the date of installation, you can also upgrade your standard warranty to 10 years. Please keep the purchasing invoice and trade mark clear for warranty.
  • Page 30: Contact Think Power

    Contact Think Power 10 Contact Think Power Please keep the following contact ways by which you can consult with us for any product problem. Add: Room 103, Building No.1, A District, 530 Development Zone, No.100, Jinxiu Road, Binhu District, Wuxi, Jiangsu Province , China Tel: 0086-510-85192198 Fax: 0086-510-85192197 Post Code: 214125...