Download Print this page

Muzata CB16 User Manual

Patent 20 pack 1/8" invisible cable railing kit

Advertisement

Quick Links

CB16
User Guide
1602002(230627)

Advertisement

loading
Need help?

Need help?

Do you have a question about the CB16 and is the answer not in the manual?

Questions and answers

Summary of Contents for Muzata CB16

  • Page 1 CB16 User Guide 1602002(230627)
  • Page 2: Specifications

    1. Overview Muzata CB16 is an invisible and swageless cable railing tensioner. With our patented design of invisible flattened tail, you can hide the end inside the wood post to get a neat appearance using the Muzata CT16 socket wrench.
  • Page 3 3. Items related Listed below are all of the accessories and tools related to the Muzata CB16. Please note that not all items are essential. Some may not be included in your package. If you need them, you may need to purchase them...
  • Page 4: Installation Steps

    4.Installation Steps 4.1 For level railing Step 1 - Locate hole position with 3" cable spacing. Step 2 - ➑ Drill through holes with drill guide on all intermediate posts with a 9/32" drill bit.
  • Page 5 Step 3 - ➑ Drill 2 3/8" deep holes with drill guide ➓ the end posts with a 13/32" drill bit Step 4 - ➏ Put the adhesive washers into the cable and pull the cable through all intermediates ➍ posts and level protector sleeves...
  • Page 6 Step 5 - ➌ ➊ Put the cable into the tensioner and install the set screws by sequence with an ➋ Allen wrench Step 6 - ➊ Tighten the tensioner with the socket ➒ wrench on the left post.
  • Page 7 Step 7 - ➌ Pull the cable against the right post and mark point A against the inside of the right post. Step 8 - Mark point B at 1 21/32" against the right ➌ side of point A. Cut the cable at point B with ➐...
  • Page 8 Step 9 - ➌ ➊ Put the cable into the tensioner and install the set screws by sequence with Allen ➋ wrench Step 10 - ➊ Tighten the tensioner with the socket ➒ wrench on the right post.
  • Page 9 Step 11 - ➏ Install the adhesive washers Step 12 - Follow the sequence to finish the other cable runs.
  • Page 10 4.2 For angle railing Step 1 - Locate hole position with 3" cable spacing. Step 2 - Drill 30 degrees through holes with drill ➑ guide on all intermediate posts with a 9/32" drill bit.
  • Page 11 Step 3 - Drill 30 degrees 2 3/8" deep holes with ➑ drill guide on the right and left posts with a 13/32" drill bit . Step 4 - ➏ Put the adhesive washers into the cable and pull the cable through all intermediates ➎...
  • Page 12 Step 5 - ➌ ➊ Put the cable into the tensioner and install the set screws by sequence with an ➋ Allen wrench Step 6 - ➊ Tighten the tensioner with the socket ➒ wrench on the left post.
  • Page 13 Step 7 - ➌ Pull the cable against the right post and mark point A against the inside of the right post. Step 8 - Mark point B at 1 21/32" against the right ➌ side of point A. Cut the cable at point B with ➐...
  • Page 14 Step 9 - ➌ ➊ Put the cable into the tensioner and install the set screws by sequence with an Allen ➋ wrench Step 10 - ➊ Tighten the tensioner with the ➒ socket wrench on the right post.
  • Page 15 Step 11 - ➏ Install adhesive washers and angle ➎ protector sleeves Step 12 - Follow the sequence to finish the other cable runs. Please note that installation videos are available on our product pages for further details if needed.
  • Page 16 5.Tips Please ensure that your posts and handrail are properly installed before start cable installation. You might need to buy extra materials than expected in case some materials might not be reusable after operation mistakes. The recommended post spacing between two wood posts is 4ft-6ft, no more than 6ft.
  • Page 17 7.About Muzata MUZATA has helped millions of families with their cable railing projects during the past years. We believe that home renovation should be easy and affordable. So we work with every effort to provide quality products and professional service, to make...

This manual is also suitable for:

Mzz1455