Kohler K-2607T Installation Instructions Manual
Kohler K-2607T Installation Instructions Manual

Kohler K-2607T Installation Instructions Manual

Bridge cabinet

Advertisement

BEFORE YOU BEGIN
BEFORE YOU BEGIN
·
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
·
All information in these instructions is based upon the
latest product information available at the time of
publication. Kohler China reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
·
Please ensure the electric work is finished before starting
to install the furniture.
·
Make sure the finished wall is straight and plumb, and the
floor is flat and perendicular to the finished wall.
·
Remove any moldings that may inhibit the vanity from
being flush against the finished wall.
·
It is recommended that the drawers be removed from the
cabinet before beginning the cabinet installation. Doing so
will ease the installation process. TRESHAM cabinet
adopts top grade manchurian ash wood veneer, E1 grade
MDF and partially natural wood. Its harmful gas emission
is less than 1.5mg/L.
·
Turn off the water supply.
·
The pluming installation must comply with Water Supply
Regulations/Bye-laws, Building Regulations or any
particular regulations and practices, specified by the local
water company or water undertakers. The installation
should be carried out by a plumber.
·
Before installation carefully inspect the new fixture for any
signs of damage.
ORDERING INFORMATION
This installation covers the following products in the
TRESHAM range:
Bridge Cabinet ......................................................K-2607T
SAFETY: WARNINGS
Kohler products are precision-engineered and should give
continued superior and safe performance, provided:
1. They are installed, commissioned, operated and
maintained in accordance with the recommendations given
in this Manual.
2. Periodic attention is given, as necessary, to maintain the
product in good functional order. Recommended
guidelines are given in the
Carefully inspect the new fixture for any signs of damage.
When installing Kohler Products, manufacturers guidelines for
power tool safety should be followed.
1044886-T01-A
1189098-T01-A
MAINTENANCE
section.
(
·
·
·
·
·
·
1.5mg/L
·
·
·
....................................................................K-2607T
1.
2.
)
158
200436
ã
ã
-1-
TRESHAM
INSTALLATION INSTRUCTIONS
BRIDGE CABINET
Copyright Kohler China Ltd., 2012
K-2607T
E1
, 2012

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the K-2607T and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Kohler K-2607T

  • Page 1 · · All information in these instructions is based upon the latest product information available at the time of publication. Kohler China reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. ·...
  • Page 2: Tools And Materials

    TOOLS AND MATERIALS · · Pencil · · Measuring Tape · · Level · · Safety Glasses · · Drill · · Screwdrivers ROUGHING-IN Reference Value UNIT : mm Kohler reserves the right to change marked dimensions without prior notice. 1189098-T01-A...
  • Page 3: Installation

    INSTALLATION 1. Install Supplies Install the services. Hot (H) and Cold (C) inlets must be connected to the correct inlet pipes. Install the drain in accordance with the manufacturer s instructions. We suggest using P-trap drain. Connect P-trap pipe with washbasin drain.
  • Page 4 3. Install the Legs IMPORTANT! Legs are not required for installation between two vanities. NOTE: To protect the finished surface of the cabinet, perform assembly tasks on a flat, padded work surface. · · Place the cabinet upright on a flat, padded surface. ·...
  • Page 5 K-45980T NOTE: The K-2607T bridge cabinet is designed to be installed with the K-45980T vanity and is not intended to be installed individually. Read both product installation instructions before beginning. The vanity should be installed before the bridge cabinet.
  • Page 6 Install the Stone Top · · 13mm Apply a 13mm dollop of siliconized acrylic caulk in each top corner of the bridge. IMPORTANT! Ensure the finished side of the stone top is up when installing. · · Single Vanity Installations: Position the top so the back is flush with the wall and the side is flush to the vanity;...
  • Page 7: User Maintenance

    6. Please do not sit, lean or step on the cabinet. 7. If any fixtures caused by abnormal reasons, Kohler China can supply paid replacement for service parts caused by abnormal reasons in the limited duration of warranty.

Table of Contents