MOTOR INSTALLATION PART# DESCRIPTION PART# DESCRIPTION BPBMO-A ---------- 3101 MOTOR ------ BPHC-A ---------- HAND CONTROL BPBMO-IR --------- 4101 MOTOR ------ BPWHCV -------- HAND CONTROL INSTRUCTIONS: With bed in the flat position, unplug the motor from the electrical outlet. The following describes the installation of a motor;...
FRAME TO PLATFORM INSTALLATION (FIG. 5) ILLUSTRATION OF A FULL SIZE BED FRAME BED LOCK INSTALLATION (King Only) Operate the foot sections, of the bed, to the raised position. Place the lock as shown in the illustration. NOTE: If there is a headboard attached to the beds, only one lock is required. If a second lock is needed: 1.
OPTIONAL COMPONENTS VIBRATOR INSTALLATION (Massage) 1. Unplug from electrical outlet before removing defective vibrator. Disconnect the vibrator from the bed motor. 2. Using a 7/16” socket, remove all 4 lock nuts. 3. If the vibrator mounts look worn, cracked or broken, they must be replaced. 4.
BED HALF RAIL INSTALLATION PARTS LIST FOR HR100 TOOLS NEEDED BP101 --------- 5/16” T-nut ½” Wrench or socket BBWASH ----- 5/16” Lock Washer BP102 --------- 5/16” Bolt H RAIL --------- Bed Rail ASSEMBLY INSTRUCTIONS 1. Raise the head section of the bed. 2.
Need help?
Do you have a question about the 3101 Series and is the answer not in the manual?
Questions and answers