Download Print this page

Anzzi FT-AZ650-59 Installation & Operation Manual

Soaking freestanding bathtub

Advertisement

Quick Links

Item:
FT-AZ650-59
SOAKING FREESTANDING BA
THTUB
INSTALLATION & OPERATION MANUAL
V1.0
07/10/2024
DON'T WAIT!
REGISTER NOW!
Register your product within 30 days to ensure your bathtub is
coverage.
Mail in the completed registry card (Pg. 2) or register online
at https://anzzi.com/pages/register.

Advertisement

loading
Need help?

Need help?

Do you have a question about the FT-AZ650-59 and is the answer not in the manual?

Questions and answers

Summary of Contents for Anzzi FT-AZ650-59

  • Page 1 Item: FT-AZ650-59 SOAKING FREESTANDING BA THTUB INSTALLATION & OPERATION MANUAL V1.0 07/10/2024 DON’T WAIT! REGISTER NOW! Register your product within 30 days to ensure your bathtub is coverage. Mail in the completed registry card (Pg. 2) or register online at https://anzzi.com/pages/register.
  • Page 2 IMPORTANT: Warranty will not be recognized unless product is registered. We offer two options to register your product. https://anzzi.com/pages/register Register online at or Scan the QR code below. Registering online is fast, secure, and ensures we receive your information. Complete, cut out, and mail the registration card below.
  • Page 3 Item: FT-AZ650-59 FREESTANDING BATHTUB Have questions? Call us at or visit us at www.ANZZI.com...
  • Page 4: Safety Instructions

    CHECK THE AREA PRIOR TO INSTALLATION. USE THE TUB’S ADJUSTABLE FEET TO ENSURE THE BATHTUB IS PERFECTLY LEVEL. IT IS ESSENTIAL THAT ALL THE FEET ARE TOUCHING THE FLOOR/SURFACE. AN UNLEVELED TUB WILL RESULT IN LEAKAGE. Have questions? Call us at or visit us at www.ANZZI.com...
  • Page 5 THE INCLUDED FLEXIBLE DRAIN IS TO BE USED ONLY TO TEST THE BATHTUB BEFORE PERMANENT INSTALLATION. IT IS THE RESPONSIBILITY OF THE INSTALLER TO PROVIDE THE PERMANENT DRAIN ASSEMBLY. Have questions? Call us at or visit us at www.ANZZI.com 110-240V...
  • Page 6 Close the drain and fill the tub about half way. • Allow the water to stand in tub for 30 minutes and then inspect all plumbing and seals for leaks. • Have questions? Call us at or visit us at www.ANZZI.com...
  • Page 7 MAKE SURE THE TUB IS PERFECTLY LEVEL TO PREVENT LEAKAGE. USE THE ADJUSTABLE LEVELING FEET TO ENSURE A LEVEL TUB. ALL LEVELING FEET MUST MAKE CONTACT WITH THE FLOOR / SURFACE. Have questions? Call us at or visit us at www.ANZZI.com...
  • Page 8 ADD A BEAD OF SILICONE AROUND THE BASE OF THE BATHTUB AND ALLOW 24 HOURS TO PASS BEFORE USE TO ENSURE THE SILICONE HAS SET. FILL THE BATHTUB FINALLY FILL THE BATHTUB WITH WATER. Have questions? Call us at or visit us at www.ANZZI.com...