Air jetted freestanding bathtub with chroma-lights (12 pages)
Summary of Contents for Anzzi CHAND 1344311
Page 1
V2.2 DON’T WAIT! REGISTER NOW! Register your product within 30 days to ensure your bathtub is recognized as an official purchase and is eligible for warranty coverage. Mail in the completed registry card (Pg. 2) or register online at www.ANZZI.com/register.
To ensure that your warranty is registered and confirmed please do one of the following: Register online at www.ANZZI.com/register. You will be asked to fill out the same information you would in the registration card. Registering online is fast, secure and ensures we receive your information.
Page 3
CHAND FREESTANDING BATHTUB 67.7” OUTER LENGTH 43.3” BASIN LENGTH R1.77” 32.3” DRAIN 18.9” BASIN OUTER WIDTH WIDTH 1.1” DECK/LIP THICKNESS 23.6” OUTER HEIGHT ANZZI 2019. ALL RIGHTS RESERVED. Have questions? Call us at 1-844-44-ANZZI or visit us at www.ANZZI.com...
Page 4
CHECK THE AREA PRIOR TO INSTALLATION. USE THE CHAND’S ADJUSTABLE FEET TO ENSURE THE BATHTUB IS PERFECTLY LEVEL. IT IS ESSENTIAL THAT ALL THE FEET ARE TOUCHING THE FLOOR/SURFACE. AN UNLEVELED TUB WILL RESULT IN LEAKAGE. Have questions? Call us at 1-844-44-ANZZI or visit us at www.ANZZI.com...
Page 5
COULD RESULT IN AN IMPROPER INSTALLATION AND COULD VOID THE WARRANTY. IMPORTANT SAFETY INSTRUCTIONS. INSTRUCTIONS IMPORTANTES RELATIVES A LA SECURITE. READ AND FOLLOW ALL INSTRUCTIONS. LIRE ET SUIVRE TOUTES LES INSTRUCTIONS. SAVE THESE INSTRUCTIONS. CONSERVER CES INSTRUCTIONS. Have questions? Call us at 1-844-44-ANZZI or visit us at www.ANZZI.com...
Page 6
THE INCLUDED FLEXIBLE DRAIN IS TO BE USED ONLY TO TEST THE BATHTUB BEFORE PERMANENT INSTALLATION. IT IS THE RESPONSIBILITY OF THE INSTALLER TO PROVIDE THE PERMANENT DRAIN ASSEMBLY. Have questions? Call us at 1-844-44-ANZZI or visit us at www.ANZZI.com...
Page 7
Close the drain and fill the tub about half way. • Allow the water to stand in tub for 30 minutes and then inspect all plumbing and seals for leaks. Have questions? Call us at 1-844-44-ANZZI or visit us at www.ANZZI.com...
Page 8
MAKE SURE THE TUB IS PERFECTLY LEVEL TO PREVENT LEAKAGE. USE THE ADJUSTABLE LEVELING FEET TO ENSURE A LEVEL TUB. ALL LEVELING FEET MUST MAKE CONTACT WITH THE FLOOR / SURFACE. Have questions? Call us at 1-844-44-ANZZI or visit us at www.ANZZI.com...
Page 9
ADD A BEAD OF SILICONE AROUND THE BASE OF THE BATHTUB AND ALLOW 24 HOURS TO PASS BEFORE USE TO ENSURE THE SILICONE HAS SET. FILL THE BATHTUB FINALLY FILL THE BATHTUB WITH WATER. Have questions? Call us at 1-844-44-ANZZI or visit us at www.ANZZI.com...
Page 10
Have questions? Call us at 1-844-44-ANZZI or visit us at www.ANZZI.com...
Need help?
Do you have a question about the CHAND 1344311 and is the answer not in the manual?
Questions and answers