Download Print this page

Anzzi Vault Series Installation & Operation Manual

Freestanding bathtub

Advertisement

Quick Links

ITEM: FT-AZ114-59
Freestanding Bathtub
INSTALLATION & OPERATION MANUAL
V1.0
11/01/2022
DON'T WAIT!
REGISTER NOW
!
Register your product within 30 days to ensure your bathtub is
coverage.
Mail in the completed registry card (Pg. 2) or register online
at www.ANZZI.com/register.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Vault Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Anzzi Vault Series

  • Page 1 ITEM: FT-AZ114-59 Freestanding Bathtub INSTALLATION & OPERATION MANUAL V1.0 11/01/2022 DON’T WAIT! REGISTER NOW Register your product within 30 days to ensure your bathtub is coverage. Mail in the completed registry card (Pg. 2) or register online at www.ANZZI.com/register.
  • Page 2: Product Registration

    FULLY COMPLETED AND RETURNED OR ONLINE REGISTRATION IS COMPLETED. Register online at www.ANZZI.com/register. You will be asked to fill out the same information you would in the registration card. Registering online is fast, secure and ensures we receive your information.
  • Page 3 FREESTANDING BATHTUB BASIN LENGTH DECK THICKNESS DRAIN HOLE Have questions? Call us at or visit us at www.ANZZI.com...
  • Page 4 COULD RESULT IN AN IMPROPER INSTALLATION AND COULD VOID THE WARRANTY. IMPORTANT SAFETY INSTRUCTIONS. INSTRUCTIONS IMPORTANTES RELATIVES A LA SECURITE. READ AND FOLLOW ALL INSTRUCTIONS. LIRE ET SUIVRE TOUTES LES INSTRUCTIONS. SAVE THESE INSTRUCTIONS. CONSERVER CES INSTRUCTIONS. Have questions? Call us at or visit us at www.ANZZI.com...
  • Page 5 3. Allow the water to stand for 30 minutes. Then inspect the drain and plumbing for any leaks. TEST THE BATHTUB WHILE YOU HAVE ACCESS TO THE BOTTOM AND BEFORE PERMANENT INSTALLATION. Have questions? Call us at or visit us at www.ANZZI.com...
  • Page 6: Spare Parts List

    THE INCLUDED FLEXIBLE DRAIN IS TO BE USED ONLY TO TEST THE BATHTUB BEFORE PERMANENT INSTALLATION. IT IS THE RESPONSIBILITY OF THE INSTALLER TO PROVIDE THE PERMANENT DRAIN ASSEMBLY. Have questions? Call us at or visit us at www.ANZZI.com 110-240V...
  • Page 7 Use a level to ensure the tub surface is level. A�er adjus�ng the leveling feet to a suitable posi�on, �ghten the securing nuts. See figure 2 Figure 1 Figure 2 Have questions? Call us at or visit us at www.ANZZI.com...
  • Page 8 Block the outlet of the FLEXIBLE DRAIN and water test the connec�ons by filling the tub with water to the overflow opening. Check for water leakage at areas indicated by arrows. (fig 2) fig 1 Must be tightened to prevent water leakage fig 2 Have questions? Call us at or visit us at www.ANZZI.com...
  • Page 10 SEAL TUB ADD A LINE OF SILICONE CAULK AROUND THE BASE OF THE BATHTUB AND ALLOW 24 HOURS TO PASS BEFORE USE TO ENSURE THE CAULK HAS SET. C LE D M I TE To preserve the polished surface, a�er using your tub, clean with so� cloth and warm soapy water to wash away any body oils or soap residue that forms a ring mark.

This manual is also suitable for:

Ft-az114-59Ft-az114-5973ch